• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 13:44来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R R  (7) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC (Ref. TASK 25-54-12-000-002). 
R R  (8) In the zone 131, remove the partition panel 131PW (Ref. TASK 25-54-12-000-001). 
R R R  (9) In the zone 151 and 161, remove the ceiling panels 151AC, 151BC, 151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-000-002) (Ref. TASK 25-55-12-000-002). 
R R  (10) In the zone 161, remove the partition panels 161DW, 162DW (Ref. TASK 25-55-12-000-001).
 **ON A/C ALL
 4. Procedure_________
 Subtask 27-21-00-210-051
 A. Visual Inspection (Ref. Fig. 603/TASK 27-21-00-991-015)
 (1) Make sure that the fairleads are in the correct condition.
 (2) At the FR70, make sure that the pressure seals (3) are correctly installed and in the correct condition.
 (3) Make sure that the turnbuckles (1) are safetied with the lock clips (2).
 (4) Make sure that there is no corrosion on the cables (Ref. TASK 20-24-11-100-001).
 (5) Make sure that the cables are not damaged (Ref. TASK 20-24-12-200-001).
 (6) Make sure that the linkage can move freely and does not touch or rub against: - the tubing, - the structures, - the electrical routing, - the adjacent controls.

 

 5. Close-up
________
 Subtask 27-21-00-942-058

 A. Make sure that the work area is clean and clear of tool(s) and other items.

R **ON A/C 001-003, 051-053,
 Subtask 27-21-00-410-054
 B. Close Access
 (Ref. Fig. 602/TASK 27-21-00-991-007)

 (1)
 In the zones 211 and 221, install the floor panels 211GF, 211KF, 221AF, 221EF 231CF (Ref. TASK 53-12-11-400-001), (Ref. TASK 53-12-12-400-001).

 (2)
 In the zones 231 and 241, install the floor panels 231WF, 241BF, 241FF, 241KF (Ref. TASK 53-22-12-400-001) (Ref. TASK 53-32-12-400-002).

 (3)
 In the zone 131, install the ceiling panels 131AC, 131BC, 131CC (Ref. TASK 25-54-12-400-002).

 (4)
 In the zone 131, install the partition panel 131PW (Ref. TASK 25-54-12-400-001).

 (5)
 In the zone 151 and 161, install the ceiling panels 151AC, 151BC, 151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-400-002) (Ref. TASK 25-55-12-000-002).

 (6)
 In the zone 161, install the partition panels 161DW, 162DW (Ref. TASK 25-55-12-400-001).

 (7)
 Close the access doors 312AR, 825, 826.

 (8)
 Remove the access platform(s).


R 1EFF : ALL 1 27-21-00Page 615 1 1 May 01/05 1 1 1CES 1


 Rudder Mechanical Control Cables Figure 603/TASK 27-21-00-991-015- 12 (SHEET 1)
 1EFF : 1 1R 1CES  ALL  1 11 1 27-21-00 Page 616 May 01/04

 

 Rudder Mechanical Control Cables Figure 603/TASK 27-21-00-991-015- 22 (SHEET 2)
 1EFF : 1 1R 1CES  ALL  1 11 1 27-21-00 Page 617 May 01/04

 


R **ON A/C 151-199, 401-499,
 Subtask 27-21-00-410-054-E
 B. Close Access
 (Ref. Fig. 602A/TASK 27-21-00-991-007-A)

 (1)
 In the zones 211 and 221, install the floor panels 211GF, 211KF, 221EF 221LF 231CF (Ref. TASK 53-12-11-400-001), (Ref. TASK 53-12-12-400-001).

 (2)
 In the zones 231 and 241, install the floor panels 231WF, 241BF, 241FF, 241KF (Ref. TASK 53-22-12-400-001) (Ref. TASK 53-32-12-400-002).

 (3)
 In the zone 131, install the ceiling panels 131KC, 131MC, 131NC (Ref. TASK 25-54-12-400-002).

 (4)
 In the zone 131, install the partition panel 131PW (Ref. TASK 25-54-12-400-001).

 (5)
 In the zone 151 and 161, install the ceiling panels 151EC, 151FC, 151GC, 161AC, 161BC (Ref. TASK 25-55-11-400-002) (Ref. TASK 25-55-12-000-002).

 (6)
 In the zone 161, install the partition panels 161DW, 162DW (Ref. TASK 25-55-12-400-001).

 (7)
 Close the access doors 312AR, 825, 826.

 (8)
 Remove the access platform(s).


 **ON A/C 301-399,
 Subtask 27-21-00-410-054-D
 B. Close Access
 (Ref. Fig. 602B/TASK 27-21-00-991-007-B)

 (1) In the zones 211 and 221, install the floor panels 211GF, 211KF, 221EF 221LF 231CF (Ref. TASK 53-12-11-400-001) (Ref. TASK 53-12-12-400-001).
R 1EFF : 151-199, 301-399, 401-499, 1 27-21-00Page 618 1 1 Aug 01/05 1 1 1CES 1


R  (2) In the zones 231 and 241, install the floor panels 231WF, 241BF, 
R  241FF, 241KF (Ref. TASK 53-22-12-400-001) (Ref. TASK 53-32-12-400-
R  002). 
R  (3) In the zone 131, install the ceiling panels 131AC, 131BC, 131CC, 
R  131DC, 131EC (Ref. TASK 25-54-12-400-002). 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵1(159)