Distribution - Description and operation
Figure 1
AFAB
Validity : S / N 585 - 9999 21 20-00 (EM) _ Page 4
SEP 04
1 - L.H. NACA air intake
2 - Radio ventilation
3 - R.H. NACA air intake
4 - Front air outlets
AFAB
Validity : S / N 585 - 9999 21 20-00 (EM) Page 5
AUG 01
Distribution - B17 cabin blower (option)
Figure 3 - S / N 585 - 587
Distribution - B17 cabin blower (option)
Figure 3A - S / N 588 - 822. 850 - 887. 889 - 947.
and S / N 823 - 849. 888 Pre-Kit OPT10 920700
AFAB
Validity : S / N 585 - 9999 21-20-00 (EM) Page 7
AUG 01
Distribution - B17 cabin blower (option)
Figure 3B - S / N 823 - 849. 888 Post-Kit OPT10 920700
Distribution - B17 cabin blower (option)
Figure 3C - S / N 948 - 952
5 6 1 - B17 cabin blower switch
2 - Rear air outlets
3 - Duct in cabin
4 - B17 cabin blower
5 - Duct in rear fuselage
6 - Rear air intake
Distribution - B17 cabin blower (option)
Figure 3D - S / N 953 - 9999
AFAB
Validity : S / N 585 - 9999 21-20-00 (EM) Page 10
AUG 011
HEATING
DESCRIPTION AND OPERATION
1. GENERAL
Heating allows air regulation using the air systems from the heat exchanger and the fresh air intakes. Temperature is controlled by the cold air / hot air ratio.
The heating system consists of :
- the heat exchanger,
- the cabin air mixer,
- the control box,
- the distribution hoses and the diffusers.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 21 AIR CONDITIONING TB20飞机维护手册 21 空调(9)