• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-20 07:59来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 TASK 22-32-02-004-002
 2.  Remove the Disengage Switch (Fig. 401)___________________________
 A.  References
 (1)  06-41-00/201, Fuselage (Major Zones 100 and 200) Access Doors and Panels
 B.  Access
 (1)  Location Zone
 211/212 Flight Compartment

 C.  Remove the Disengage Switch
 S 864-001
 (1)  Open this circuit breaker on the overhead circuit breaker panel, P11, and attach DO-NOT-CLOSE tag:
 (a)  11F15, TMC DC
 S 014-003
 (2)  
Remove the thrust lever knob.

 S 034-004

 (3)  
Remove the heat-shrink tubing from the wire terminals.

 S 034-005

 (4)
Remove the screw-attached wires from the disengage switch.

 (5)  
Remove the disengage switch.


 S 024-006
 TASK 22-32-02-404-007
 3.  Install the Disengage Switch (Fig. 401)____________________________
 A.  Consumable Materials
 (1)  Heat Shrink Tubing - RT876, Color Yellow,
 Raychem Corp., Menlo Park, CA.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-32-02
 ALL  ú ú 01 Page 401 ú Jan 28/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL

THRUST LEVER ASSEMBLY
P11 PANEL SEE A
P10 PANEL 
FLT COMPT 
THRUST LEVER  RIGHT DISENGAGE 
ASSEMBLY  SWITCH 

THRUST LEVER KNOB 
LEFT DISENGAGE SWITCH 
A THRUST LEVER ASSEMBLY
Figure 401 Disengage Switches - Installation 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-32-02
 ALL  ú ú 01 Page 402 ú Mar 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (2)  Locktite 222
 B. References
 (1)  
06-41-00/201, Fuselage (Major Zones 100 and 200) Access Doors and Panels

 (2)  
22-00-02/201, Autoflight BITE

 (3)  
24-22-00/201, Electrical Power - Control


 C. Access
 (1)  Location Zone
 211/212 Flight Compartment

 D. Install the Disengage Switch
 S 164-008
 (1)  
Remove all of the remaining locktite from the thrust lever threads.

 S 394-009

 (2)  
Apply new locktite to the disengage switch threads.

 S 424-010

 (3)  
Install the disengage switch.

 S 434-011

 (4)  
Apply the heat-shrink tubing to the wire terminals (heat shrink after the wires are installed).

 S 434-012

 (5)  
Use the screws supplied with the switch to install the wires on the switch.

 S 394-013

 (6)  
Heat shrink the heat-shrink tubing.

 S 414-014

 (7)  
Install the thrust lever knob on the thrust lever.


 E. Do a Test of the Disengage Switch
 S 864-015
 (1)  Supply electrical power (Ref 24-22-00).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 22-32-02
 ALL  ú ú 01 Page 403 ú Jan 28/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 (2)  S 864-016Remove the DO-NOT-CLOSE tag and close this circuit breaker on the P11 panel: (a) 11F15, TMC DC
 (3)  S 864-017Make sure these circuit breakers on the P11 panel are closed: (a) 11F14, TMC AC (b) 11F16, TMC SERVO
 (4)  S 714-018Do the MCDP Ground Test 12 SW A/T DISC (Ref 22-00-02).
 (5)  S 864-019Remove electrical power if it is not necessary (Ref 24-22-00).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 自动飞行 AUTOFLIGHT 2(134)