• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-31 23:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 |  Do this every 90 days. |  |  |  |  |  |  |  |  |

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 10-12-00
 ALL  ú ú 02 Page 221 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 ~............................................................................... | | Procedures Repeat Intervals (Days) | | ....................................... | | | | | | | | | As| | Item | Initial | 7 | 14| 30| 60| 90|180|Rqd| .................................................................................
 |  2. Apply a layer of MIL-C-16173, Class 2|  X |  |  |  |  |  |  |  |
 |  to the steel parts that are not|  |  |  |  |  |  |  |  |
 |  painted. Apply as it is specified|  |  |  |  |  |  |  |  |
 |  for steel fittings on the flaps that|  |  |  |  |  |  |  |  |
 |  are not painted (see FLIGHT CONTROLS|  |  |  |  |  |  |  |  |
 |  storage).|  |  |  |  |  |  |  |  |
 |  3. Lower (or open) all the flaps (the |  X  |  |  |  |  |  X  |  |  |
 |  leading and trailing edge) and|  |  |  |  |  |  |  |  |
 |  the spoilers and examine them for|  |  |  |  |  |  |  |  |
 |  corrosion. Stow all flaps in the up|  |  |  |  |  |  |  |  |
 |  (closed) position. Do this every 90|  |  |  |  |  |  |  |  |
 |  days.|  |  |  |  |  |  |  |  |
 |  4. Examine the structural drain holes to|  X  |  |  |  |  |  X  |  |  |
 |  make sure they are open. Do this|  |  |  |  |  |  |  |  |
 |  every 90 days.|  |  |  |  |  |  |  |  |
 |  5. Examine the vertical and horizontal |  X  |  |  |  |  |  X  |  |  |
 |  stabilizer balance bays and access|  |  |  |  |  |  |  |  |
 |  panel areas for corrosion. Do a|  |  |  |  |  |  |  |  |
 |  check of one left bay and one right|  |  |  |  |  |  |  |  |
 |  and mark it. If corrosion is found,|  |  |  |  |  |  |  |  |
 |  inspect all bays. If no corrosion is|  |  |  |  |  |  |  |  |
 |  found, do this step every 90 days.|  |  |  |  |  |  |  |  |
 |  Each time you do the check, examine|  |  |  |  |  |  |  |  |
 |  different bays.|  |  |  |  |  |  |  |  |
 |  6. Before you store the airplane, spray |  X |  |  |  |  |  |  |  |
 |  the front and rear spar cavities|  |  |  |  |  |  |  |  |
 |  with the corrosion preventive|  |  |  |  |  |  |  |  |
 |  compound. Apply it with the limits|  |  |  |  |  |  |  |  |
 |  specified in step 2.|  |  |  |  |  |  |  |  |

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 10-12-00
 ALL  ú ú 01 Page 222 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 ~............................................................................... | | Procedures Repeat Intervals (Days) | | ....................................... | | | | | | | | | As| | Item | Initial | 7 | 14| 30| 60| 90|180|Rqd| .................................................................................
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PARKING AND MOORING(28)