• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-31 23:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 ~............................................................................... | | Procedures Repeat Intervals (Days) | | ....................................... | | | | | | | | | As| | Item | Initial | 7 | 14| 30| 60| 90|180|Rqd| .................................................................................
 6. Apply a layer of MIL-C-16173, Class 2| |  X |  |  |  |  |  |  |  |
 corrosion preventive compound to all| |  |  |  |  |  |  |  |  |
 hydraulic system plumbing that is not| |  |  |  |  |  |  |  |  |
 painted. It is not necessary to| |  |  |  |  |  |  |  |  |
 apply the coating to the hydraulic| |  |  |  |  |  |  |  |  |
 system plumbing installed in areas| |  |  |  |  |  |  |  |  |
 which have the humidity and| |  |  |  |  |  |  |  |  |
 temperature controlled as specified| |  |  |  |  |  |  |  |  |
 in INTERIORS storage requirements.| |_________ |  |  |  |  |  |  |  |
 7. Lubricate the hydraulic snubbers on| |  |  |  |  X  |  |  |  |  |
 the aft airstair.| |  |  |  |  |  |  |  |  |
 8. Examine the fluid level in the| |  |  |  |  X  |  |  |  |  |
 hydraulic snubbers of the aft| |  |  |  |  |  |  |  |  |
 airstair every 30 days.| |  |  |  |  |  |  |  |  |
 9. On day 30 and every 30 days, examine| |  |  |  |  X  |  |  |  |  |
 the tubes and components that you can| |  |  |  |  |  |  |  |  |
 get to. If you find corrosion, do a| |  |  |  |  |  |  |  |  |
 complete check of all other tubes.| |  |  |  |  |  |  |  |  |
 Completely clean all the areas where| |  |  |  |  |  |  |  |  |
 corrosion is found. Preserve the| |  |  |  |  |  |  |  |  |
 area and refer to the Boeing| |  |  |  |  |  |  |  |  |
 Corrosion Manual for more action that| |  |  |  |  |  |  |  |  |
 is possible you must do.| |  |  |  |  |  |  |  |  |
 10. Examine all the surfaces that have| |  |  |  |  |  |  X  |  |  |
 hydraulic assembly lubrication or| |  |  |  |  |  |  |  |  |
 corrosion preventive compound on| |  |  |  |  |  |  |  |  |
 them.| |  |  |  |  |  |  |  |  |
 | |  |  |  |  |  |  |  |  |
 | EQUIPMENT/FURNISHINGS |_____________________ |  |  |  |  |  |  |  |
 | |  |  |  |  |  |  |  |  |
 | Do these steps to supply protection for |  |  |  |  |  |  |  |  |
 | a maximum of 30 days: |  |  |  |  |  |  |  |  |
 1. Install dust covers on the seats.| |  X |  |  |  |  |  |  |  |
 | 2. The carpets and seats can stay in the|  |  |  |  |  |  |  |  |
 airplane for 30 days after storage| |  |  |  |  |  |  |  |  |
 begins with no humidity control| |  |  |  |  |  |  |  |  |
 required.| |  |  |  |  |  |  |  |  |
 | 3. If toilet waste systems have been |  |  |  |  |  |  |  |  |
 serviced and activated, do these| |  |  |  |  |  |  |  |  |
 steps:| |  |  |  |  |  |  |  |  |

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PARKING AND MOORING(22)