 PLANT AND APU storage instructions)| |  |  |  |  |  |  |  |  |
 must be run from tank to engine for| |  |  |  |  |  |  |  |  |
 50% run duration and center tank| |  |  |  |  |  |  |  |  |
 to all engines for 50% run duration.| |  |  |  |  |  |  |  |  |
 This procedure will keep a| |  |  |  |  |  |  |  |  |
 circulation of fuel in the tanks.| |  |  |  |  |  |  |  |  |
 It will also keep the boost pumps and| |  |  |  |  |  |  |  |  |
 the fuel system plumbing O-ring and| |  |  |  |  |  |  |  |  |
 seals becoming dry. You must remove| |  |  |  |  |  |  |  |  |
 the tanks vent covers installed in| |  |  |  |  |  |  |  |  |
 step 1. above during the engine| |  |  |  |  |  |  |  |  |
 preservation runs.| |  |  |  |  |  |  |  |  |
 | |  |  |  |  |  |  |  |  |
 | EXTERIOR SURFACE PROTECTION |___________________________ |  |  |  |  |  |  |  |
 | |  |  |  |  |  |  |  |  |
 | 1. On areas that do not have paint, do |  |  |  |  |  |  |  |  |
 one of the steps that follows:| |  |  |  |  |  |  |  |  |
 A. Wash the airplane at 7 to 14 day| |  |  X  |  X  |  |  |  |  |  |
 intervals, (AMM 12-40-00/201) or| |  |  |  |  |  |  |  |  |
 B. Apply the wax and wash the| |  |  |  |  X  |  |  |  |  |
 complete airplane at 4 week| |  |  |  |  |  |  |  |  |
 intervals (AMM 12-40-00/201).| |  |  |  |  |  |  |  |  |
 Apply wax again after you wash the| |  |  |  |  |  |  |  |  |
 airplane, or| |  |  |  |  |  |  |  |  |
 C. Apply a layer of temporary| |  X |  |  |  |  |  |  |  |
 protective coating to all metal| |  |  |  |  |  |  |  |  |
 that is not painted. Do not apply| |  |  |  |  |  |  |  |  |
 it to the engine tail cones and| |  |  |  |  |  |  |  |  |
 other high temperature parts which| |  |  |  |  |  |  |  |  |
 are subjected to high operational| |  |  |  |  |  |  |  |  |
 temperature (paint would burn| |  |  |  |  |  |  |  |  |
 off). Apply protective coating| |  |  |  |  |  |  |  |  |
 Ardrox 306-N as follows:| |  |  |  |  |  |  |  |  |
 (1) Wash the area to remove all| |  |  |  |  |  |  |  |  |
 oil, grease, fingerprints,| |  |  |  |  |  |  |  |  |
 dust, volcanic ash and other| |  |  |  |  |  |  |  |  |
 unwanted material| |  |  |  |  |  |  |  |  |
 (AMM 12-40-00/201).| |  |  |  |  |  |  |  |  |
 You can apply the temporary| |  |  |  |  |  |  |  |  |
 coating directly over a layer| |  |  |  |  |  |  |  |  |
 of previously applied similar| |  |  |  |  |  |  |  |  |
 coating.| |  |  |  |  |  |  |  |  |

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 10-12-00
 ALL  ú ú 02 Page 213 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 