曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
8. Apply power to all electronic systems| | | | | X | | | | |
| and instrument lights (not the | | | | | | | | |
| vertical and directional gyros, | | | | | | | | |
| weather radar systems and inertial | | | | | | | | |
| navigation systems) for a minimum of| | | | | | | | |
| 2 hours. On used airplanes, only | | | | | | | | |
| apply power for 1 hour on all the | | | | | | | | |
| Digital Flight Management System | | | | | | | | |
| equipment. | | | | | | | | |
9. Operate the vertical and directional| | | | | X | | | | |
| gyros for approximately 1/2 hour. | | | | | | | | |
10. Operate the weather radar system for| | | | | X | | | | |
| 10 minutes in the test mode. If no | | | | | | | | |
| test mode is available, operate it | | | | | | | | |
| at the maximum range. | | | | | | | | |
|
|
|
|
|
|
|
|
|
|
| WARNING:| _______ DO NOT OPERATE THE RADAR |
|
|
|
|
|
|
|
|
|
INSIDE ASSEMBLY BUILDINGS, |
|
|
|
|
|
|
|
|
|
HANGARS OR OTHER PLACES WHERE || |
|
|
|
|
|
|
|
|
THE RADAR BEAM POINTS TOWARD |
|
|
|
|
|
|
|
|
|
NEARBY PERSONNEL, EXPLOSIVES |
|
|
|
|
|
|
|
|
|
OR LARGE METAL OBJECTS |
|
|
|
|
|
|
|
|
|
(AIRPLANE, FUEL TANKS, ETC). |
|
|
|
|
|
|
|
|
| | | | | | | | | |
| CONTROL CABIN EQUIPMENT_______________________ | | | | | | | | |
| | | | | | | | | |
1. Install pitot-static probe covers| | X | | | | | | | |
| on all pitot-static probes | | | | | | | | |
| to prevent contamination from | | | | | | | | |
| dirt, dust, debris and volcanic | | | | | | | | |
| ash. | | | | | | | | |
| Cover for pitot-static probes - | | | | | | | | |
| P/N HTC73-75PPCW. | | | | | | | | |
| Install covers on all pitot | | | | | | | | |
| tubes on vertical stabilizer. | | | | | | | | |
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
737-300 400 500 AMM 飞机维护手册 PARKING AND MOORING(12)