................................................................................. | 2. Open and ventilate the air | X | | | | | | | | | conditioning mix bay | | | | | | | | | ................................................................................. | 3. Bleed the moisture from the | X | | | | | | | | | drain fittings of the sensing | | | | | | | | | | line in the pack bay. | | | | | | | | | ................................................................................. | 4. If you run the engine to control | | | | | | | | X | | the total acid number and water | | | | | | | | | | content of the engine oil (Ref | | | | | | | | | | POWER PLANT AND APU STORAGE)____________________________| | | | | | | | | | operate the air conditioning systems | | | | | | | | | | in conjunction with the engine as | | | | | | | | | | follows: | | | | | | | | | | | | | | | | | | | | NOTE: Do not operate the air | | | | | | | | |
____ | flow multiplier. | | | | | | | | | | | | | | | | | | X | ................................................................................. | A. Operate each air conditioning | | | | | | | | | | system with its applicable | | | | | | | | | | engine for the complete time | | | | | | | | | | of the engine run. | | | | | | | | | .................................................................................
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
10-12-00
ALL ú ú 01 Page 204 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
~............................................................................... | | Procedures Repeat Intervals (Days) | | ....................................... | | | | | | | | | As| | Item | Initial | 7 | 14| 30| 60| 90|180|Rqd| .................................................................................
| 5. If you remove the engine to keep it | X | | | | | | | |
| in storage and you preserve the | | | | | | | | |
| APU with periodic operation (Ref | | | | | | | | |
| POWER PLANT AND APU STORAGE) do | | | | | | | | |
| the steps that follow: | | | | | | | | |
................................................................................. | A. Install an applicable pressure | | | | | | | | | | type plug on the engine bleed | | | | | | | | | | ducts at the engine disconnect. | | | | | | | | | ................................................................................. | B. Operate air conditioning systems | | | | | | | | | | for a minimum of 10 minutes during| | | | | | | | | | each APU run (2 packs at the | | | | | | | | | | same time. | | | | | | | | | 2.........................................….........…...…...…...…...…...…...…...1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
10-12-00
ALL ú ú 02 Page 205 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
~............................................................................... | | Procedures Repeat Intervals (Days) | | ....................................... | | | | | | | | | As| | Item | Initial | 7 | 14| 30| 60| 90|180|Rqd| .................................................................................
| ELECTRICAL/ELECTRONIC SYSTEMS_____________________________ | | | | | | | | |
| | | | | | | | | |
1. Electrically ground the airplane| | X | | | | | | | |
| (AMM 20-40-11/201). | | | | | | | | |
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 PARKING AND MOORING(10)