• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 16:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (a) Remove the 0.75 in. (19.05 mm) square drive socket and 2 ft. (0.6 mm) breaker bar from the core rotation drive pad.
 F 『 EEFF : ALL E Page 63872-52-00
 E E May 01/05 ERE
ECES  E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 (b) Install the handcranking drive pad cover (Ref. TASK 72-63-00-400-002).

 (c) Remove the drive motor from the starter pad of the AGB.

 (d) Install the starter (Ref. TASK 80-11-10-400-002).


 5. Close-up
________ Subtask 72-52-00-410-054
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.

 (2) Close the thrust reverser doors (Ref. TASK 78-36-00-410-040). FOR 1000EM1 451AL, 452AR FOR 1000EM2 461AL, 462AR


 Subtask 72-52-00-440-052
 B. Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041). Subtask 72-52-00-410-055
 C. Close Access
 (1) Close the fan cowls (Ref. TASK 71-13-00-410-040):
 FOR 1000EM1
 437AL, 438AR
 FOR 1000EM2
 447AL, 448AR.


 (2) Remove the access platform(s).

 (3) Remove the warning notice(s).


 F 『 EEFF : ALL E Page 63972-52-00
 E E May 01/05 ERE
ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 TASK 72-52-00-290-004- 01

 Borescope Inspection of the High Pressure Turbine Rotor Blade (from the front)
 1. Reason for the Job
__________________

 This TASK is applicable for /P engines.
 Inspection of the high pressure turbine (HPT) blades from the front is
 limited to the areas that can be seen with a flexible borescope installed at
 the spark igniter ports (S10 and S11).

 NOTE : There are 80 HPT blades installed in the rotor.

____

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform
 No specific protective caps
 No specific warning notice
 No specific 0.75 in. square drive socket
 No specific 2ft. long breaker bar
 856A1310 1 KIT, BORESCOPE GUIDE - HP TURBINE
 856A1321 1 FIBERSCOPE SET
 856A1322 1 BORESCOPE - LIGHT SOURCE SET
 856A1323 1 MONITOR, RESOLUTION BORESCOPE
 856A1488 1 MOTOR, DRIVE - CORE ENGINE ROTATION

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 72-00-00-200-025 Over-Serviceable-Limit Extensions 72-42-00-290-005 Inspection of the Combustion Chamber and HPT Nozzle
 Following a Birdstrike/FOD
 72-63-00-000-002 Removal of the Handcranking Drive Cover
 72-63-00-400-002 Installation of the Handcranking Drive Cover
 74-21-30-000-002 Removal of the Spark Igniter
 74-21-30-400-002 Installation of the Spark Igniter

 F 『 EEFF : ALL E Page 64072-52-00
 E E May 01/05 ERE ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
78-30-00-081-041 Make the Thrust Reverser Serviceable after Maintenance 78-30-00-481-041 Make the Thrust Reverser Unserviceable for
 Maintenance 78-36-00-010-040 Opening of the Thrust Reverser Doors 78-36-00-410-040 Closing of the Thrust Reverser Doors 80-11-10-000-002 Removal of the Pneumatic Starter 80-11-10-400-002 Installation of the Pneumatic Starter NTM 72-00-00 72-52-00-991-304 Fig. 601 72-52-00-991-300 Fig. 602 72-52-00-991-305 Fig. 605 72-52-00-991-306 Fig. 606 72-52-00-991-307 Fig. 609
 3. Job Set-up
__________
 Subtask 72-52-00-941-054
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3) On the overhead maintenance panel 50VU:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ENGINE 发动机 2(69)