• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 16:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 L. Fuel nozzles for  Not serviceable See limit extensions dislodged wear (Ref. TASK 72-00-00-200-sleeves 025)
 3. Inner and outer liners for :
 F 『 EEFF : ALL E Page 61072-42-00
 E E Feb 01/04 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 -------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
A. Outer liner axial cracks  Any number across 1 Panel or less and up to 3 cracks across more than 1 panel but not longer than 3 panels  If up to 3 cracks extendacross more than 3 panels,borescope the outer sideof the outer liner in thecrack locations (Ref. TASK 72-42-00-290-006). See limit extension
 (Ref. TASK 72-00-00-200-025).

 NOTE : When applying limits, the dome band is interpreted as a panel.
____
 B. Inner liner axial cracks  Any number across 1 panel or less and up to 3 cracks across more than 1 panel but not longer than 3 panels  If up to 1 crack is across4 Panels, and no materialis missing more than 2times the diameter of adilution hole and does not
 connect to a
 circumferential crack
 longer than 0.5 in. (12.7 mm), then reinspect in 750 cycles. 
R  C. Circumferential  There is no limit to the  See limit extensions 
R R R R  cracks  number with these conditions: The cracks are no longer than 2 dilution lands. There  (Ref. TASK 72-00-00-200-025) 
R  are no more than 2 
R R  adjacent cracks in a dilution land. The 
R R  cracks are separated by a minimum of 3 dilution 
R  lands that do not have 
R  cracks.

 NOTE : A dilution land is the area of the panel between the dilution
____See limit extension(Ref. TASK 72-00-00-200-025)
 holes.
 D. Connected cracks  Connection of any axial 
and circumferential 
cracks up to max limits 
of paragraphs A. B. and
 C. above. Limit is
 exceeded when third
 crack connects

 F 『 EEFF : ALL E Page 61172-42-00
 E E Feb 01/03 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 -------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
E. Burn through or  Per liner : 6 areas, See limits extension
 missing material  each 2 times the (Ref. TASK 72-00-00-200-diameter of a dilution 025) hole. 2 areas of burn-through or missing material may be aligned axially on adjacent panels if they are at least 3 dilution lands from another area of burn-through or missing material.
 F. Distortion  Any amount within 0.5 See limit extension in. (12.7 mm) of (Ref. TASK 72-00-00-200-original contour 025)
 (6) When the inspection is complete, turn off the light source and remove the borescope.

 (7) If any defects are found then remove additional borescope plugs and the spark igniters to inspect all of the combustion chamber. If no defects are found, install parts removed for borescope inspection.


 Subtask 72-42-00-010-064
 C. Remove parts before additional borescope inspection.
 (1) Remove the drain tube from the fuel nozzle adjacent to the 6 o'clock borescope plug.
 NOTE : If you remove the drain tube from the fuel nozzle adjacent to
____ the 6 o'clock borescope plug, you will be required to perform a leak check after this inspection. Use the 6 o'clock borescope port only if necessary.
 (2) Remove the borescope plugs from the approximate 1 and 6 o'clock positions.

 (3) Remove both spark igniters (Ref. TASK 74-21-30-000-002).

 (4) Install protective caps on the leads and the spark igniters.


 F 『 EEFF : ALL E Page 61272-42-00
 E E Feb 01/03 ERE
ECES  E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 Subtask 72-42-00-290-056

 D. Do a borescope inspection of the entire combustion chamber.
 (1) Repeat paragraph 4.B.(1) thru 4.B.(5) for each borescope and spark igniter location.
 Subtask 72-42-00-410-059
 E. Install parts removed for borescope inspection.
R (1) Apply a small amount of graphite grease (Material No. CP2101) or R Never Seez-Pure Nickel, Special (Material No. CP2619) to the R borescope plug threads and pressure faces.
 (2) Install the borescope plugs.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ENGINE 发动机 2(44)