• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 16:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 E E


 3. Job Set-up
__________ Subtask 72-56-00-010-066
 A. Get Access
 (1) Remove the core nozzle (Ref. TASK 78-11-11-000-041).

 (2) Remove the center body (Ref. TASK 78-11-12-000-041).


 4. Procedure
_________ (Ref. Fig. 801/TASK 72-56-00-991-310) Subtask 72-56-00-350-053
 A. Replacement of the thermal insulation blankets. CAUTION : THE REPLACEMENT OF THE THERMAL INSULATION BLANKETS (ITEM 150
_______ ONLY) MUST NOT BE PERFORMED IN LINE DUE TO THEIR SPECIFIC SHAPE. THE REMOVAL OF THERMAL INSULATION BLANKETS (ITEM 150) CAN BE PERFORMED DURING SHOP VISIT WHEN THE SEAL COVER IS REMOVED.
 (1) Replacement (for item 130 and 140 only).
 (a) Remove the attachment bolts on rear flange of the thermal insulation blanket.

 After SB 72-247

 (b) Remove the attachment bolts and washers on rear flange of the thermal insulation blanket.

 END of SB 72-247

 (c) Remove the blanket by lifting the rear flange, then pull and twisting it.

 (d) Install the new thermal insulation blanket. Take care to engage front edge inside seal cover.

 (e) Apply a thin layer of graphite grease (Material No. CP2101) on the bolts.


 F 『 EEFF : ALL E Page 80672-56-00
 E E Aug 01/99 E E ECES E E 56-5B E

 F  『
 E  C F M  E
 E  E


 E E

 (f) Install the two bolts securing the blanket. After SB 72-247

 (g) Install the two washers and two bolts securing the blanket. END of SB 72-247

 (h) TORQUE the bolts to between 100 and 110 lbf.in (1.13 and 1.24 m.daN).


 5. Close-up
________ Subtask 72-56-00-410-066
 A. Close Access
 (1) Install the center body (Ref. TASK 78-11-12-400-041).

 (2) Install the core nozzle (Ref. TASK 78-11-11-400-041).


 F 『 EEFF : ALL E Page 80772-56-00
 E E May 01/04 ERE
ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 TASK 72-56-00-300-006
 Replacement of the Oil Supply Tube Assembly
 1. Reason for the Job
__________________
 This procedure is done when the oil does not flow freely by oil cocking.
 This procedure is applicale only for engines Post SB CFMI 72-0403.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  warning notice
R No specific  Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft) 856A2677 1 FIXTURE INSTALLATION AND REMOVAL
 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
Material No. CP2104  *
 molykote G rapid plus (solid lubricant)
 (Ref. 70-30-00)

 Material No. CP2442 * engine oil (Ref. 70-30-00) (Ref. 70-30-00) Material No. CP8001 USA AMS 5687 Safetywire 0.032 in. (0.8mm) DIA (Ref.70-30-00) (Ref. 70-30-00) Material No. CP8002 USA AMS 5689 Safetywire 0.032 in. (0.8mm) DIA (Ref.70-30-00) (Ref. 70-30-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 F 『 EEFF : ALL E Page 80872-56-00
 E E May 01/05 E E ECES ER C. Expendable Parts

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E 


R -------------------------------------------------------------------------------R FIG.ITEM |DESIGNATION |IPC-CSN R -------------------------------------------------------------------------------
R 70 oil supply tube 72-56-00 02A-190 R 70 oil supply tube 72-56-00 02B-190
R 80 coupling nut R 80 coupling nut R 90 retaining ring R 90 retaining ring 72-56-00 02A-180 72-56-00 02B-180 72-56-00 02A-170 72-56-00 02B-170
R D. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 12-13-79-610-002 R R 72-56-00-000-001 R 72-56-00-400-001 R R 78-11-11-000-041 R 78-11-11-400-041 R 78-11-12-000-041 R 78-11-12-400-041 R 72-56-00-991-311
R 3. Job Set-up
__________
R Subtask 72-56-00-941-062
R A. Safety Precautions Check oil level and replenish Check Pop Out Indicator of EMCD (Electrical Master Chip Detector) Removal of the Flame Arrestor and Flange Assembly Installation of the Flame Arrestor and Flange Assembly Removal of the Core Nozzle Assembly Installation of the Core Nozzle Assembly Removal of the Centerbody Installation of the Centerbody Fig. 802
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ENGINE 发动机 2(118)