• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:59来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3) On the overhead maintenance panel 50VU:

 (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b) Put a warning notice to tell persons not to energize the FADEC 1(2).

 


 Subtask 79-31-40-010-053
 B. Open the fan cowl doors: (Ref. TASK 71-13-00-010-040)
 FOR 1000EM1
 437AL, 438AR
 FOR 1000EM2
 447AL, 448AR

 F 『 EEFF : ALL E Page 60279-31-40
 E E May 01/05 E E ECES E 4. Procedure

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


_________
 (Ref. Fig. 601/TASK 79-31-40-991-300) Subtask 79-31-40-210-051
 A. Inspection of the Oil Temperature Sensor
 -------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
1. Do a visual inspection of the oil temperature sensor for:
 A. Cracks  Not serviceable. Replace the oil temperature sensor (Ref. TASK 79-31-40-000-002) and (Ref. TASK 79-31-40-400-002).
 2. Do a visual inspection of the electrical connector for:
 A. Threads for: Damage  30 percent damage in one lead-in thread or 20 percent damage on several threads  Chase threads if inlimits, or replace oiltemperature sensor(Ref. TASK 79-31-40-000-002) and (Ref. TASK 79-31-40-400-002).
 B. Pin contacts for :
 Bend Seizure Breakage  Must engage freely in related socket contacts  Straighten bent pins orreplace oil temperaturesensor if pins are broken, eroded or seized
 (Ref. TASK 79-31-40-000-002) and (Ref. TASK 79-31-40-400-002).
 C. Connector well
 for:

 F 『 EEFF : ALL E Page 60379-31-40
 E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E

 

 Oil Temperature Sensor
 Figure 601/TASK 79-31-40-991-300

 F 『 EEFF : ALL E Page 60479-31-40
 E E Feb 01/98 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 -------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS
 -------------------------------------------------------------------------------R Dirt None permitted. Clean with bristle brush R and Stoddard solvent R (Material No. CP2011) or R acetone (Material No. R CP1039) or ardrox 552 R (Material No. CP2559) or R turco ind 79 (Material No. R CP2560) or mag-chem teksol R (Material No. CP2566) or R degreasol 99 R (Material R No. CP2584) or mag-chem R skysol (Material No. R CP2656) or white spirit
 (Material No. CP2010).
 5. Close-up
________
 Subtask 79-31-40-410-052
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.

 (2) Close the fan cowl doors: (Ref. TASK 71-13-00-410-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR

 (3) Remove the warning notice(s).


 F 『 EEFF : ALL E Page 60579-31-40
 E E May 01/05 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 TASK 79-31-40-700-001
 Test of the Oil Temperature Sensor
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific digital multimeter
 No specific soft-nose connector pliers
 No specific warning notice

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors
 71-13-00-410-040 Closing of the Fan Cowl Doors
R 79-31-40-000-002 Removal of the Oil Temperature Sensor (IDG Cooling
R System Control Sensor)
R 79-31-40-400-002 Installation of the Oil Temperature Sensor (IDG
R Cooling System Control Sensor)
 3. Job Set-up
__________
 Subtask 79-31-40-941-053
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM OIL 滑油(63)