• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:59来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (b) Lubricate the mating faces of the cleaned items with Brisal-OX (Material No. CP2338).

 (c) Attach the bonding strip (180) to the rear face of the flange E, at hole No. 78, with the bolt (190) and spacer (200) (the head of bolt and the spacer forwards), and the nut (210).

 (d) TORQUE the nut (210) to between 100 and 110 lbf.in (1.13 and 1.24 m.daN).


 (7) Install tubes and hoses on the oil tank as follows.
 (a) Make sure that gaskets (40, 90, 110) are serviceable and that the mating faces of tubes and hoses (50, 70, 120) and of the oil tank

 (30) are clean.

 (b) Lubricate the gaskets (40, 90, 110) with engine oil (Material No. CP2442).

 (c) Lubricate the threads of bolts (10, 60, 80) with graphite grease (Material No. CP2101).

 (d) Attach the oil supply tube (50) and the gasket (40) to the oil tank (30), with 4 bolts (60).

 (e) Attach the discharge hose (70) and the gasket (90) to the oil tank (30), with 4 bolts (80).


 F 『 EEFF : ALL E Page 41379-11-10
 E E May 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E


 E 56-5B E
 E E


 (f) Attach the vent hose (120) and the gasket (110) to the oil tank (30), with 4 bolts (10).

 (g) TORQUE the bolts (10, 60, 80) to between 45 and 55 lbf.in (0.50 and 0.62 m.daN).

 (h) Lubricate the threads of the oil tank nipple and of the oil scupper nipple with engine oil (Material No. CP2442).


 (8) Connect the Drain Tube. CAUTION : USE 2 WRENCHES TO REMOVE OR INSTALL THE TUBE COUPLING NUTS.
_______ ONE WRENCH TO HOLD THE UNION AND ONE TO LOOSEN OR TIGHTEN THE COUPLING NUT. THIS WILL PREVENT DAMAGE TO THE HARDWARE.
 (a) Connect the drain tube (20) to the oil scupper nipple. Connect the hose (100) to the oil tank nipple.

 (b) TORQUE the coupling nuts to between 135 and 150 lbf.in (1.52 and


 1.69 m.daN).
 (9) Install the oil quantity transmitter (Ref. TASK 79-31-15-400-041). Subtask 79-11-10-869-050
 B. Make sure that the work area is clean and clear of tool(s) and other items.
 Subtask 79-11-10-610-052
 C. Fill tank to full mark (Ref. TASK 12-13-79-610-002) or (Ref. TASK 12-13-79-610-002).
 Subtask 79-11-10-942-050
 D. Remove the warning notice(s). Subtask 79-11-10-710-051
 E. Operate engine at ground idle or above for a minimum of 3 minutes and check for leaks (Ref. TASK 71-00-00-710-006) and (Ref. TASK 79-00-00-210-003).
 Subtask 79-11-10-610-053
 F. Fill tank to full mark (Ref. TASK 12-13-79-610-002) or (Ref. TASK 12-13-79-610-002).
 F 『 EEFF : ALL E Page 41479-11-10
 E E May 01/05 ERE
ECES E 5. Close-up

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


________
 Subtask 79-11-10-410-058
 A. Close the fan cowl doors (Ref. TASK 71-13-00-410-040): FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
 F 『 EEFF : ALL E Page 41579-11-10
 E E May 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 OIL TANK - INSPECTION/CHECK
___________________________ TASK 79-11-10-200-002 Inspection/Check of the Oil Tank
 1. Reason for the Job

__________________
 Self Explanatory


 2. Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 79-00-00-210-003 Visual Inspection of the Oil System 79-11-10-300-003 Replacement of the O-ring of the Oil Tank Filler Cap 79-11-10-300-004 Replacement of the O-ring of the Oil Cap Assembly
 3. Job Set-up
__________ Subtask 79-11-10-941-057
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.


 F 『 EEFF : ALL E Page 60179-11-10
 E E Feb 01/98 E E ECES E
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM OIL 滑油(27)