2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 79-21-20-000-002 Removal of the Main Oil/Fuel Heat Exchanger 79-21-20-400-002 Installation of the Main Oil/Fuel Heat Exchanger
3. Job Set-up
__________ Subtask 79-21-20-941-052
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
F 『 EEFF : ALL E Page 60179-21-20
E E Feb 01/98 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 79-21-20-010-054
B. Open the fan cowl doors: (Ref. TASK 71-13-00-010-040)
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR
4. Procedure
_________
Subtask 79-21-20-210-051
A. Visually inspect the main oil/fuel heat exchanger
-------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
1. All areas for :
A. Cracks Not serviceable Replace main oil/fuel heat exchanger (Ref. TASK 79-21-20-000-002) and (Ref. TASK 79-21-20-400-002)
2. External sealing faces for :
A. Dents, gouges, Not serviceable Replace main oil/fuel heat
scratches exchanger (Ref. TASK 79-21-20-000-002) and (Ref. TASK 79-21-20-400-002)
F 『 EEFF : ALL E Page 60279-21-20
E E Feb 01/98 E E ECES E 5. Close-up
F 『
E C F M E
E E
E 56-5B E
E E
________ Subtask 79-21-20-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Close the fan cowl doors: (Ref. TASK 71-13-00-410-040)
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR
(3) Remove the warning notice(s).
F 『 EEFF : ALL E Page 60379-21-20
E E Feb 01/98 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
INDICATOR - VISUAL - MAINTENANCE PRACTICES
__________________________________________
TASK 79-21-30-440-001
Resetting of the Visual Indicator
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific warning notice
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. CP8001 *
lockwire 0.032 in. (0.8 mm) DIA (Ref. 70-30-00)
Material No. CP8002 *
lockwire 0.032 in. (0.8 mm) DIA (Ref. 70-30-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors
71-13-00-410-040 Closing of the Fan Cowl Doors
79-21-30-991-300 Fig. 201
R 79-21-30-991-303 Fig. 202
F 『 EEFF : ALL E Page 20179-21-30
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM OIL 滑油(49)