• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:14来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R  No specific  Milliohmmeter
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R  20-28-00-720-001 20-28-00-869-002  Low-Current Test MethodTable of the Maximum Permitted Resistance Values
 3. Job Set-up__________
 Subtask 20-28-00-869-060 
R  A. General 
R R R  (1) This is the recommended procedure for the check of the electrical bonding of the different components (but not the fluid systems and the components installed on composite materials). 
R R R R (2) As an alternative method, for test with an ouput test current of 10 amperes, you can use the low-current test method (Ref. TASK 20-28-00-720-001). 


 4.
 Procedure

_________

 5.
 Close-up

 

 Subtask 20-28-00-869-061 
R  A. Measurement of the Electrical Resistance 
R  CAUTION : MAKE SURE THAT YOU DO NOT CAUSE DAMAGE TO THE EQUIPMENT OR THE_______ 
R  STRUCTURE WHEN YOU USE SHARP-POINT PRODS. 
R  CAUTION : MAKE SURE THAT THE TEST EQUIPMENT IS CORRECTLY INSTALLED BEFORE_______ 
R  YOU MEASURE THE BONDING VALUES. 
R  (1) Equipment 
R  (a) Milliohmmeter, multirange, with the related leads and prods: 
R  1_  Range and output test current:
R  - 500 milliohms with an output test current of 1 ampere (for a 
R  max. resistance value of more than 200 milliohms), 
R  - 200 milliohms with an output test current of 10 amperes (for 
R  a max. resistance value of not more than 200 milliohms). 
R  2_  Accuracy:
R  - better than plus or minus 10 % of the measured value. 
R  3_  For example: Milliohmmeter GUERPILLON type DIGITHOM 1998
R  (2) Connect the test equipment at the applicable locations (Ref. TASK 20-
R  28-00-869-002). 
R  (3) Measure the electrical resistance. 
R  (4) Make sure that the measured values are not higher than the maximum 
R  permitted values (Ref. TASK 20-28-00-869-002). 
R  (5) Remove the test equipment. 
R


________

R
 Subtask 20-28-00-942-094 
R  A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.


 TASK 20-28-00-720-006


 Check of the Electrical Bonding of the Fluid Systems
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific Milliohmmeter (not for test in the fuel tanks) No specific Milliohmmeter - intrinsic safety (for test in the fuel tanks)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-28-00-869-002 Table of the Maximum Permitted Resistance Values 28-00-00-910-001 Fuel Safety Procedures 28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank
 3. Job Set-up
__________
 Subtask 20-28-00-869-062

 A. Preparation
 (1) For test of fluid system components (not in the fuel tanks)
 (a) Equipment 1 Milliohmmeter (not for test in the fuel tanks) with the
_ related leads and prods: - output test current: 0.1 amperes maximum
 -range: 500 milliohms minimum R - precision: better than plus or minus 10 % of the measured R value.
 (2) For test of fluid system components in the fuel tanks WARNING : BEFORE YOU DO WORK IN A FUEL TANK, MAKE SURE THAT YOU OBEY
_______ ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.


 WARNING : FOR TESTS IN THE FUEL TANKS, MAKE SURE THAT YOU USE AN
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STANDARD PRACTICES-AIRFRAME(98)