 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Temporary Repair of Hydraulic A201 ALL Tubes Repair of the Titanium-Alloy A222 ALL Hydraulics Tubes with HARRISON Sleeves and Unions Repair of the Hyraulic Tubes with A239 ALL CRYOFIT Couplings 3PHS111-XX repair of the Hydraulic Tubes with A268 ALL RYNGLOK Unions Temporary Repair of Hydraulic A284 ALL Tubes by Welding
 LINE TYING 20-23-14
 MAINTENANCE PRACTICES 201 ALL Protection Against vibration and 201 ALL Chafing of Hydraulic Pipes
 HYDRAULIC BOBBINS 20-23-21
 MAINTENANCE PRACTICES 201 ALL Removal/Installation of the 201 ALL Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins
 MARKING OF TIGHTENED UNIONS 20-23-22
 MAINTENANCE PRACTICES 201 ALL Marking of the Unions after 201 ALL Standard or Specific Tightening Torque Application
 INSTALLATION AND REPAIR OF WATER AND 20-23-38
 AIR SUPPLY TUBING

 MAINTENANCE PRACTICES 201 ALL Removal of the Tubes of the 201 ALL Potable Water and the Air Supply System Repair of the Tubes Assembly of 207 ALL the Potable Water and the Air Supply System to be carried out in the Workshop Repair of the Tubes of the Potable 234 ALL Water and the Air Supply System to be carried out in the Aircraft Repair of the Tubes with 256 ALL H-Fittings to be carried out in the Aircraft Temporary Repair of the Tube 265 ALL Assemblies with MS21922 Sleeves to be carried out in the Workshop
 20-CONTENTS Page 3 Aug 01/05 R CES


 CHAPTER 20
__________
 STANDARD PRACTICES-AIRFRAME
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Installation of the Tubes Assembly 276 ALL of the Potable Water and Air Supply System
 CONTROL CABLES AND PULLEYS 20-24-00 DESCRIPTION AND OPERATION 1 ALL
 General 1 ALL
 CONTROL CABLE INSTALLATION AND 20-24-11
 CLEANING

 MAINTENANCE PRACTICES 201 ALL Installation of the Control Cables 201 ALL Cleaning and Protection of the 204 ALL Cables
 CONTROL CABLE AND PULLEY CHECK 20-24-12
 INSPECTION/CHECK 601 ALL Check of the Control Cables 601 ALL Inspection of the Pulleys 609 ALL
 INSTALLATION OF EXPANSION JOINTS 20-26-00 MAINTENANCE PRACTICES 201 ALL Installation of Expansion Joints 201 ALL
 ELECTRICAL CABLES AND BUNDLES 20-27-00 MAINTENANCE PRACTICES 201 ALL Installation of Grommets 201 ALL
 ELECTRICAL BONDING 20-28-00
 MAINTENANCE PRACTICES 201 ALL Electrical Bonding of Components 201 ALL with Rivets Electrical Bonding of Components 206 ALL With Conductive Bolts and Screws in the Tanks Electrical Bonding of Electrical 211 ALL Connectors Electrical Bonding of Components 216 ALL With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-Electrical Bonding of Antennas 226 ALL With Conductive Bolts. Electrical Bonding of Pipes 230 ALL Electrical Bonding of Composites 239 ALL Electrical Bonding by Direct 246 ALL Contact
 20-CONTENTS Page 4 Aug 01/05 R CES


 CHAPTER 20
__________
 STANDARD PRACTICES-AIRFRAME
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________
 ELECTRICAL BONDING 20-28-00
 ADJUSTMENT/TEST 501 ALL Table of the Maximum Permitted 501 ALL Resistance Values Low-Current Test Method 514 ALL Check of the Electrical Bonding of 516 ALL the Different Components (But not the Fluid Systems and the Components Installed on Composite materials) Check of the Electrical Bonding of 519 ALL the Fluid Systems Check of the Electrical Bonding of 522 ALL the Different Components Installed on Composite Materials Check of the Electrical Bonding of 524 ALL External Composite Panels with a CORAS Resistivity-Continuity Test Set Check of the Electrical Bonding of 527 ALL External Composite Panels (without Non-Conductive Finish paint) with a Megohmeter Measurement of the Surface 529 ALL Electrical Resistance of External Composite Panels with a CORAS Resistivity-Continuity Test Set Measurement of the surface 532 ALL Electrical Resistance of External Composite Panels (without Non-Conductive Finish Paint) with Electrical Conductive Tape Measurement of the Surface 536 ALL Electrical Resistance of External Composite Panels (without Non-Conductive Finish Paint) with Probes Check of the Aircraft Electrical 540 ALL Grounding Loop Impedance Test 542 ALL
 O-RING INSTALLATION 20-29-00 MAINTENANCE PRACTICES 201 ALL Removal/Installation of an O-ring 201 ALL
 20-CONTENTS Page 5 May 01/05 R CES


 CHAPTER 20
__________
 STANDARD PRACTICES-AIRFRAME
 TABLE OF CONTENTS_________________
 