-
upstream of the engine pump (Ref. TASK 29-00-00-870-001)
-
upstream of the PTU (Ref. TASK 29-00-00-870-002)
-downstream of the engine pump (Ref. TASK 29-00-00-870-003).
(b)
For the Yellow system:
-
upstream of the engine pump (Ref. TASK 29-00-00-870-004)
-
upstream of the PTU (Ref. TASK 29-00-00-870-005)
-
upstream of the Yellow E-pump (Ref. TASK 29-00-00-870-006)
-downstream of the engine pump (Ref. TASK 29-00-00-870-007).
1EFF : ALL 1 20-23-11Page 264 1 1 Aug 01/04R 1 1 1CES 1
(c)
For the Blue sytem:
-upstream of the Blue E-pump (Ref. TASK 29-00-00-870-008)
-downstream of the Blue E-pump (Ref. TASK 29-00-00-870-009).
(d)
For the normal braking system (Ref. TASK 32-42-00-870-001).
(e)
For the alternate braking system.
-low pressure (Ref. TASK 32-43-00-612-001)
-high pressure (Ref. TASK 32-43-00-870-002).
(6) Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 20-23-11-917-077
G. apply the Protection on the Repaired Tubes (if applicable)
(1) after the applicable leak test and bleeding procedure, apply the protection on the repaired tubes (if applicable).
(a)
For aluminum tube:
-apply PRETREATMENT FOR PAINTING (Material No. 13-002) on the bare metal of the tube with a brush
-complete the protection with STRUCTURE PAINTS (Material No. 16-001C)
(b)
For CRES tube (if painted):
-rub the bare metal with scotch-brite pad
-apply STRUCTURE PAINTS (Material No. 16-020) on the bare metal of the tube
-complete the protection with STRUCTURE PAINTS (Material No. 16-001C)
1EFF : ALL 1 20-23-11Page 265 1 1 Aug 01/04R 1 1 1CES 1
TASK 20-23-11-300-002
Repair of the Corrosion-Resistant Steel and Aluminum-Alloy Tubes with HARRISON Sleeves and Unions
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific HARRISON elastomeric swaging tools
No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-012 USA VV-P-236 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00) Material No. 08-009 USA MIL-R-46082 PRIMER, ACTIVATOR FOR ANAEROBIC (Ref. 20-31-00) Material No. 08-024 USA MIL-R-46082 TYPE III ADHESIVE COMPOUND (Ref. 20-31-00) R Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00)
R 1EFF : ALL 1 20-23-11Page 266 1 1 Nov 01/04 1 1 1CES 1 C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump
12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
29-00-00-870-001 Bleeding Procedure of the Green Hydraulic System
Upstream of the Engine Pump
29-00-00-870-002 Bleeding Procedure of the Green Hydraulic System
Upstream of the PTU
29-00-00-870-003 Bleeding Procedure of the Green Hydraulic System
Downstream of the Engine Pump
29-00-00-870-004 Bleeding Procedure of the Yellow Hydraulic System
Upstream of the Engine Pump
29-00-00-870-005 Bleeding Procedure of the Yellow Hydraulic System
Upstream of the PTU
29-00-00-870-006 Bleeding Procedure of the Yellow Hydraulic System
Upstream of the Yellow E-Pump
29-00-00-870-007 Bleeding Procedure of the Yellow Hydraulic System
Downstream of the Engine Pump
29-00-00-870-008 Bleeding Procedure of the Blue Hydraulic System
Upstream of the Blue E-Pump
29-00-00-870-009 Bleeding Procedure of the Blue Hydraulic System
Downstream of the Blue E-Pump
29-10-00-863-001 Pressurize the Green Hydraulic System
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STANDARD PRACTICES-AIRFRAME(31)