曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
6 - In flight procedure
Table of Contents
A project supported by AIRBUS and the CAAC
Date of the module
ETOPS (Extended Range for Twin engined Operations)
Regulations
ICAO: - Annex 6 - Chapter 4 (par.4.7) + Attachment E
EUROPE (JAA): - IL n°20 + JAR OPS1
USA (FAA): AC 120-42/A
A project supported by AIRBUS and the CAAC
Date of the module
Airworthiness OPERATIONAL
Establishement of procedures
+
authorization granted
by the state
Airworthiness certificate
permits operations
beyond the
60 mn threshold
ETOPS Approval
A project supported by AIRBUS and the CAAC
Date of the module
incorporated into AFM
+
CMP Document ETOPS
(Configuration Maintenance & procedures)
ELIGIBILITY
Reliability of the systems
CAPABILITY
Propulsion system
maturity and reliability
ETOPS - AIRWORTHINESS Requirements
A project supported by AIRBUS and the CAAC
Date of the module
The aircraft is under airworthiness requirements
Insurance of the operator on the following
points
the flight can continue safely under degraded
conditions
specifics procedures for maintenance
specifics operational procedures
Crew training programme
Documentation must cover all relevant aspects
ETOPS - OPERATIONAL Requirements
A project supported by AIRBUS and the CAAC
Date of the module
When requirements are satisfied
A B
C
180 mn
1 eng. inop.
Operation up to 180 mn threshold
ETOPS Approval
A project supported by AIRBUS and the CAAC
Date of the module
120 minutes
A project supported by AIRBUS and the CAAC
Date of the module
180 minutes
A project supported by AIRBUS and the CAAC
Date of the module
A 310 ETOPS Routes
A project supported by AIRBUS and the CAAC
Date of the module
Area of operations: IL n°20
ETOPS Approval
MTOW
optimum Altitude
« Long Range »
MLR
2h
IFSD weight
Approved OEI cruise speed
A project supported by AIRBUS and the CAAC
Date of the module
Area of operations: IL n°20
ETOPS Approval
Approved OEI cruise speed IFSD weight
60 mn 120 mn 180 mn
L/Dmax
Speed
increases
The AFM has to contain at least two OEI speed capability charts
ISA conditions in still air
MCT
A project supported by AIRBUS and the CAAC
Date of the module
Area of operations: IL n°20
ETOPS Approval
Approved OEI cruise speed
ISA conditions in still air
60 mn 120 mn 180 mn
IFSD weight
L/Dmax MCT
120 mn: area of operations
A project supported by AIRBUS and the CAAC
Date of the module
Area of operations
Départure
Aerodrome Destination
adéquate
Destination
alternate
Aerodrome
adéquate
Prohibited area
ETOPS: area of operations
EEP EXP
EEP : ETOPS Entry Point EXP : ETOPS eXit Point
A project supported by AIRBUS and the CAAC
Date of the module
1 - Principle
2 - Engine-out regulations
3 - ETOPS principle
4 - Obstacles to consider
5 - Engine-out limitations
6 - In flight procedure
Table of Contents
A project supported by AIRBUS and the CAAC
Date of the module
Obstacles to consider
planned
route
L/2>=5NM
Engine-out limitations (JAR OPS 1.500 et 1.505)
CCAR121.183:L/2=13.5NM(25KM)
A project supported by AIRBUS and the CAAC
Date of the module
1 - Principle
2 - Engine-out regulations
3 - ETOPS principle
4 - Obstacles to consider
5 - Engine-out limitations
6 - In flight procedure
Table of Contents
A project supported by AIRBUS and the CAAC
Date of the module
Engine
failure
Gross
flight path
Conditions
-maxi continuous
thrust
-min drag speed
-With or without
anti-icing
Engine-out limitations (JAR OPS 1.500 et 1.505)
A project supported by AIRBUS and the CAAC
Date of the module
net gradient = gross gradient - gradient reduction
net
flight path
Gross
flight path
Engine
failure
Engine-out limitations (JAR OPS 1.500 et 1.505)
A project supported by AIRBUS and the CAAC
Date of the module
Gradient reduction
1 engine inoperative
1.1% for a twin engined aircraft
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
flight operation 飞行运行概述(45)