71-00-02 
 
PW2000 SERIES ENGINES
757 
POWERPLANT BUILDUP MANUAL
10TH Stage Duct Installation 
Figure 10-3 (Sheet 2)
71-00-02 
P/P BUILDUP FIGURE 10-3 Page 4 May 05/2009 
 
ITEM NO.  PART NUMBER  NOMENCLATURE  UC  QTY  
10-3  10TH STAGE DUCT INSTALLATION (FIGURE 10-3, SHEET 2) INSTALL PACKING (35), UNION (40), AND ELBOW (45) INTO SUPPLY PORT ON DUAL PURPOSE VALVE. INSTALL PACKING (50), UNION (55), AND ELBOW (60) ON CHECK VALVE (5).  
35  BACP11K4  . PACKING  1  
40  MS21902J4  . UNION, REDUCER  1  
45  BACE21BT0404JN  . ELBOW, SWIVEL  1  
50  BACP11K6  . PACKING  1  
55  MS21902J6  . UNION  1  
60  NAS1762J0606  . ELBOW, SWIVEL INSTALL HOSE ASSY (65) INTO ELBOW (45) AND THE CONTROL PRESSURE PORT OF THE HP PILOT CONTROLLER. INSTALL HOSE ASSY (70) INTO ELBOW (60) AND THE DOWNSTREAM PRESSURE PORT OF THE HP PILOT CONTROLLER.  1  
65  16135-55  . HOSE ASSY (V99755) (BOEING 60B90135-55)  VEN  - 
65  108167-55  . HOSE ASSY (V78570) (BOEING 60B90135-55)  VEN  - 
65  60B90135-55  . HOSE ASSY, SUPPLY PRESSURE  1  
70  16135-53  . HOSE ASSY (V99755) (BOEING 60B90135-53)  VEN  - 
70  108167-53  . HOSE ASSY (V78570) (BOEING 60B90135-53)  VEN  - 
70  60B90135-53  . 
HOSE 
ASSY, 
DOWNSTREAM 
PRESSURE 
SECURE 
HOSE 
ASSYS 
(65, 
70) 
AND 
HOSE 
ASSY 
(145, 
REF 
14TH 
STAGE 
DUCT 
INSTALLATION/Figure 
10-2) 
USING 
ITEMS 
(75 
THRU 
95). 
 1  
75  BACC10HS08  . CLAMP  2  
80  BACC10HS11  . CLAMP  2  
85  BACS12HN3U7  . SCREW  2  
90  NAS1149C0332R  . WASHER  2  
95  BACN10YR3C  . NUT ACHIEVE BEST POSSIBLE ALIGNMENT OF DUCTS AND TIGHTEN COUPLINGS (15) TO 105-120 LB-IN.  2 
71-00-02 
 
PW2000 SERIES ENGINES
757 
POWERPLANT BUILDUP MANUAL
FIGURE 11-1 
FIRE/OVERHEAT DETECTOR INSTALLATION
REF QEC TASK NO.: 11 
REF DWG: 332N3500 332N3250 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 动力装置安装手册 Powerplant Buildup Manual(87)