Temporary Revision  Inserted  Removed  
Number  Date  Date  Initials  Date  Initials 
RECORD OF TEMPORARY REVISION
Page 2 May 05/2009 
 
INTRODUCTION 
1.  General 
A.  The 757/PW2000 Series Powerplant Buildup Manual provides procedures for installing Boeing QEC Kit parts on a PW2000 series engine. 
B.  The manual is divided into five major sections: 71-00-00 Introduction and Indexes, 71-00-01 Accessory Assembly, 71-00-02 Powerplant Buildup, 71-00-03 QEC Systems Tests, and 71-00-04 QEC Inspection/ Check. 
(1)  
Section 71-00-00 describes major characteristics of the powerplant, use of the manual, a list of special tools and equipment, vendor names and addresses, consumable materials, and a summary of applicable standard practices.
(2)  
Section 71-00-01 contains parts lists and procedures for preassembly of certain QEC components installed as maximum convenience units during buildup.
(3)  
Section 71-00-02 contains parts lists and procedures to build up a basic engine into a demountable powerplant.
(4)  
Section 71-00-03, QEC Systems Tests, contains procedures that are used to test the components prior to engine installation on an airplane.
(5)  
Section 71-00-04 QEC Inspection/Check contains general inspection/check procedures for QEC components.
C.  Abbreviations and terms used in this manual are defined in the following table: 
Table 1: 
ABBREVIATION  DEFINITION  ABBREVIATION  DEFINITION  
AR  As Required  
ASSY  Assembly  LWR  Lower  
BG  Build Group  
BRKT  Bracket  MAX  Maximum  
CL  Centerline  MIN  Minimum  
CSK  Countersink  MNFLD  Manifold  
DIFF  Differential  MTG  Mounting  
DIM  Dimension  OPT  Optional  
ECS  Environmental  OUTBD  Outboard  
Control System  OVHT  Overheat  
ELEC  Electrical  PNEU  Pneumatic  
ENG  Engine  PRESS  Pressure  
PW or P&W  Pratt & Whitney  
FLG  Flange  QAD  Quick-Attach-Detach  
FTG  Fitting  QEC  Quick Engine Change  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 动力装置安装手册 Powerplant Buildup Manual(4)