71-00-02
Oil Pressure Transmitter and Pressure Switch Installation Figure 7-5 (Sheet 3)
71-00-02
ITEM NO. PART NUMBER NOMENCLATURE UC QTY
7-5 OIL PRESSURE TRANSMITTER AND PRESSURE SWITCH INSTALLATION (FIGURE 7-5, SHEET 3) POSITION PRESSURE XMTR (110) ON BRACKET, SO THAT THE VENT PORT IS OUTBOARD, USING NUT (115). TORQUE NUT TO 250-300 LB-IN AND LOCKWIRE BY THE DOUBLE TWIST METHOD (REF BAC 5018).
110 418-01114 . PRESSURE XMTR (V58880) (BOEING S332T305-5) VEN -
110 S332T305-5 . PRESSURE TRANSMITTER, NO. 4 BEARING SCAVENGE 1
115 BACN10DR12J . NUT INSTALL PLUG (116) INTO PRESSURE XMTR (110). 1
116 69B91183-1 . PLUG INSTALL PACKING (120) AND UNION (125) INTO PRESSURE XMTR (110). PLACE TEE (130) ONTO UNION (125). DO NOT TIGHTEN. 1
120 M83248-2-904 . PACKING 1
125 MS21902J4 . UNION 1
130 BACT16BT040404JN . TEE, SWIVEL INSERT TUBE ASSY (135) ONTO TEE (130) AND TEE (35). DO NOT TIGHTEN. SECURE TUBE ASSY (135) TO BRACKETS USING ITEMS (140 THRU 156). TIGHTEN TEE (35) AND TEE (130). 1
135 332N3450-15 . TUBE ASSY 1
140 BACC10HS04 . CLAMP 4
145 BACC10GT2-04 . CLAMPSHELL 8
150 BACS12HN3U9 . SCREW 4
155 BACN10YR3C . NUT 4
156 NAS1149C0332R . WASHER 4
71-00-02
Oil Pressure Transmitter and Pressure Switch Installation Figure 7-5 (Sheet 4)
71-00-02
ITEM NO. PART NUMBER NOMENCLATURE UC QTY
7-5 OIL PRESSURE TRANSMITTER AND PRESSURE SWITCH INSTALLATION (FIGURE 7-5, SHEET 4) THIS SHEET NOT USED
71-00-02
Oil Pressure Transmitter and Pressure Switch Installation Figure 7-5 (Sheet 5)
71-00-02
ITEM NO. PART NUMBER NOMENCLATURE UC QTY
7-5 OIL PRESSURE TRANSMITTER AND PRESSURE SWITCH INSTALLATION (FIGURE 7-5, SHEET 5) INSERT PACKING (165) AND UNION (170) INTO NO. 4 BEARING SCAVENGE TUBE.
165 M83248-2-904 . PACKING 1
170 MS21902J4 . UNION INSTALL TUBE ASSY (175) ONTO TEE (130) AND UNION (170). 1
175 332N3450-26 . TUBE ASSY SECURE TUBE ASSY (175) USING ITEMS (180 THRU 200). 1
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 动力装置安装手册 Powerplant Buildup Manual(74)