71-00-02 
 
PW2000 SERIES ENGINES
757 
POWERPLANT BUILDUP MANUAL
Primary Exhaust Installation 
Figure 13-1 (Sheet 2)
71-00-02 
P/P BUILDUP FIGURE 13-1 Page 4 May 05/2009 
 
ITEM NO.  PART NUMBER  NOMENCLATURE  UC  QTY  
13-1  PRIMARY EXHAUST INSTALLATION (FIGURE 13-1, SHEET 2) APPLY ANTI-SEIZE COMPOUND TO THREADS OF SHEAR PINS (25). INSTALL SHEAR PIN (25) IN HOLES JUST BELOW THE 3 AND 9 O’CLOCK POSITIONS ON FLANGE -T-USING NUTS (30).  
25  69B97200-3  . SHEAR PIN  2  
30  BACN10HR4C  . NUT ATTACH HOISTING SLING TO NOZZLE ASSY (35). POSITION NOZZLE ASSY (35) OVER PLUG ASSY (15). ALIGN SHEAR PINS (25) AND MOUNTING HOLES ON ENGINE FLANGE -T-. ATTACH NOZZLE ASSY (35) TO FLANGE WITH ITEMS (40 THRU 50). INSTALL WASHER (45) UNDER BOLT (40). TIGHTEN NUTS (50) TO 85-95 LB-IN.  2  
35  314N3310-35  . NOZZLE ASSY  1  
35  314N3310-34  . NOZZLE ASSY  OPT  - 
40  BACB30PN4-5  . BOLT  60  
45  NAS1587-4C  . WASHER  60  
50  BACN10HR4C  . NUT  60 
71-00-02 
 
PW2000 SERIES ENGINES
757 
POWERPLANT BUILDUP MANUAL
FIGURE 14-1 
INLET COWL INSTALLATION
REF QEC TASK NO.: 14 
REF DWG: 330N3010
71-00-02 
P/P BUILDUP FIGURE 14-1 Page 1 May 05/2009 
 
PW2000 SERIES ENGINES
757 
POWERPLANT BUILDUP MANUAL
Inlet Cowl Installation 
Figure 14-1 (Sheet 1)
71-00-02 
P/P BUILDUP FIGURE 14-1 Page 2 May 05/2009 
 
ITEM NO.  PART NUMBER  NOMENCLATURE  UC  QTY  
14-1  INLET COWL INSTALLATION (FIGURE 14-1, SHEET 1) INSTALL SHEAR PINS (5) IN ENG FLG -A-AND SECURE WITH ITEMS (10, 15).  
5  314T3019-2  . SHEAR PIN  2  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 动力装置安装手册 Powerplant Buildup Manual(102)