• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-21 08:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Aft Flaps  23
 Alternate Control Panel  15
 Fairings  25
 Flap Carriages  23
 Flap Control Cables  16
 Flap Control Lever  15
 Flap Power Drive Unit (PDU)  16
 Flap Torque Tubes  21
 Flap Transmissions  23
 Flap/Slat Depressurization  19
 Module
 Flap/Slat Electronic Unit  25
 (FSEU)
 Flight Deck Interface  33
 Position Indicators  33
 Resolvers  32
 Synchros  33
 Operation  33
 Control  35
 Functional Description  33
 Component Location  101 
Component Index
 Component Location
 Maintenance Practices  201 
Deactivation of the Flap Drive  201
 System
 Operation of the TE Flap  207
 System

EffectivityALL
ALLALL

 27-CONTENTS

 GUN Page 19 Jan 20/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
 CHAPTER 27 - FLIGHT CONTROLS
 TABLE OF CONTENTS
_________________
 Subject
_______
Adjustment/Test Adjustment of the TE Flap System
 Operational Test of the Flap/Slat Alternate Drive System
 Operational Test of the TE Flap System TE Flap Load Relief - System Test
 TE Flap System - System Test Inspection/Check BALLSCREW - INBOARD TRAILING
EDGE FLAP Removal/Installation Inspection/Check
BALLSCREW - OUTBOARD TRAILING
EDGE FLAP Removal/Installation Inspection/Check
CARRIAGE - INBOARD TRAILING EDGE FLAP Removal/Installation CARRIAGE - OUTBOARD TRAILING EDGE FLAP Removal/Installation COMPONENTS - TRAILING EDGE FLAP POWER DRIVE UNIT
 Maintenance Practices Install the PDU Components Remove the PDU Components
DRIVESHAFT - TRAILING EDGE FLAP Removal/Installation FAIRING - INBOARD TRAILING EDGE FLAP TRACK Maintenance Practices
Adjustment/Test of the Fairing for the Inboard TE Flap Track
 Install the Fairings for the Inboard TE Flap Tracks Remove the Fairings for the Inboard TE Flap Tracks
 Chapter SectionSubject_______ Page____ Effectivity
501 ALL518
553
501
555
523601 ALL27-51-11
401 ALL601 ALL27-51-21
401 ALL601 ALL27-51-05
401 ALL27-51-16
401 ALL27-51-27
201 ALL205201
27-51-34401 ALL27-51-30
201 ALL214
211
201

 27-CONTENTS

 GUN Page 20 May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
 CHAPTER 27 - FLIGHT CONTROLS
 TABLE OF CONTENTS
_________________
 Subject
_______
FAIRING - OUTBOARD TRAILING EDGE FLAP TRACK Maintenance Practices Adjustment/Test of the Forward and Aft Fairings Install the Fairings for the Outboard TE Flap Tracks Remove the Fairings for the Outboard TE Flap Tracks
 FLAP - INBOARD TRAILING EDGE Removal/Installation Adjustment/Test
Adjustment for the Inboard Trailing Edge Flap Inboard Trailing Edge Flap Test Inspection/Check FLAP - INBOARD TRAILING EDGE
FLAP-AFT Removal/Installation Adjustment/Test
Inboard Aft Flap Adjustment Operational Test for the Aft Flap
 FLAP - OUTBOARD TE FLAP AFT Removal/Installation Adjustment/Test
Adjust the Aft Flap for the Outboard TE Flap Test of the Aft Flap Installation
 FLAP - OUTBOARD TRAILING EDGE Removal/Installation Adjustment/Test
Adjust the Outboard TE Flap The Outboard Trailing Edge Flap Test GEARBOX - INBOARD TRAILING EDGE FLAP DRIVE INBOARD ANGLE Removal/Installation GEARBOX - INBOARD TRAILING EDGE FLAP DRIVE INBOARD TEE Removal/Installation
Chapter SectionSubject_______ Page____ Effectivity
27-51-31201 ALL211
208
201
27-51-02401 ALL501 ALL501
523
601 ALL27-51-12
401 ALL501 ALL501511
27-51-22401 ALL501 ALL501
510
27-51-14401 ALL501 ALL501520
27-51-09
401 ALL27-51-07
401 ALL

 27-CONTENTS

 GUN Page 21 May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 CHAPTER 27 - FLIGHT CONTROLS
 TABLE OF CONTENTS
_________________
 Subject
_______
GEARBOX - INBOARD TRAILING EDGE FLAP DRIVE OUTBOARD ANGLE Removal/Installation GEARBOX - INBOARD TRAILING EDGE FLAP DRIVE OUTBOARD TEE Removal/Installation GEARBOX - OUTBOARD TRAILING EDGE FLAP TEE Removal/Installation
LEVER - FLAP CONTROL
Removal/Installation
Inspection/Check
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 1(7)