• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-30 15:04来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A.  This procedure adjusts (rigs) the nose gear manual extension system to obtain the cable tensions and clearances between components necessary for proper system operation.
2.  Equipment and Material
A. Rigging Pin- 0.311 + 0.000/-0.002 -inch diameter x 5.00 inches long, Type MS20392-4C
NOTE:  Rigging pin is part of F70207-61.
B.  Gear Ground Lock Assembly (Ref 32-00-01)
C.  Spring scale -0 to 100 pounds capacity
3.  Adjust Nose Gear Manual Extension System (Fig. 501
A.  Align rig pin holes and install rigging pin through release mechanism torque tube and pulley bracket assembly.
B.  Remove cabin floor panel and remove turnbuckle locking clips from cable MNGEA.
C.  Rig MNGE cable
(1)  
Rig cable to 100 pound rigging load.

(2)  
Reduce rig load until cable tension matches that of spring tension and rig pin is free.


NOTE:  When performing step C, check that release handle is properly seated in V-slot of manual extension control.
520 
Oct 20/84  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  32-35-0 Page 501 


Nose Gear Manual Extension System  500 
32-35-0  Figure 501 (Sheet 1)  Nov 15/67 
Page 502 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


500  Nose Gear Manual Extension System 
Aug 15/77  Figure 501 (Sheet 2)  32-35-0 
Page 503 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


D.  Install turnbuckle locking clips on cable MNGEA (Ref Chapter 20, Cable Turnbuckle Locking Clip).
E.  Install cabin floor panel.
F.  Remove rigging pin.
4.  Test Nose Gear Manual Extension System
A.  Test Manual Extension System (Airplane on Jacks)
(1)  
Jack airplane until nose gear tires clear ground (Ref Chapter 7, Jacking).

(2)  
Connect external electrical power supply.

(3)  
Pressurize hydraulic system A (Ref 29-11-0 MP).

(4)  
Remove gear ground lock assembly from nose gear (Ref 32-00-01).

WARNING:  CHECK THAT GROUND LOCK ASSEMBLIES ARE INSTALLED IN MAIN LANDING GEAR TO PREVENT INADVERTENT OPERATION OF GEAR. INJURY TO PERSONNEL AND/OR EQUIPMENT COULD RESULT IF GEAR RETRACTS.

(5)  
Check that nose gear is centered.

(6)  
Use override trigger and place landing gear control lever in UP position to retract nose gear to up and locked position. Place control lever in OFF position. Maintain hydraulic system A pressure at 3000 psi.


CAUTION:  CHECK THAT LANDING GEAR CONTROL LEVER IS PLACED IN OFF POSITION WHEN OPERATING MANUAL EXTENSION SYSTEM. IF MANUAL EXTENSION HANDLE IS HELD IN ANY EXTENDED POSITION AND CONTROL LEVER IS MOVED TO UP POSITION, SYSTEM CABLE FEEDBACK WILL CAUSE MANUAL EXTENSION HANDLE TO SNAP BACK FORCIBLY INTO V-SLOT.
DO NOT TURN STEERING WHEEL WITH NOSE GEAR SHOCK STRUT FULLY EXTENDED TO PREVENT POSSIBLE DAMAGE TO SHOCK STRUT CENTERING CAMS.
(7)  
Open manual extension access door and attach spring scale to nose gear manual extension handle.

(8)  
Pull upward and forward on manual extension handle with spring scale for full travel of approximately 8 inches.

(a)  
Check that force required to release nose gear from up and locked position does not exceed 70 pounds.

(b)  
Check that nose gear free falls to down and locked position as evidenced by green indicator light on pilots' landing gear panel or that red marks on nose gear lock strut visual indicator align within + 0.03 inch.

 

(9)  
Place control lever in UP position to retract nose gear to up and locked position. Place control lever in OFF position.

(10)
Depressurize hydraulic system A.

(11)
Repeat step (8). Results should be same.

(12)
Restore airplane to normal.

(a)  
Install gear ground lock assembly (Ref 32-00-01).

(b)  
Close manual extension access door.

(c)  
Determine if there is further need for hydraulic and electrical power on airplane, if not, shut down sources.

(d)  
Lower airplane and remove jacks (Ref Chapter 7, Jacking Airplane).

 


500 
32-35-0 Page 504  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  Jun 20/87 


B.  Test Manual Extension System (Airplane on Gear)
(1)  
Check ground lock assemblies are installed (Ref 32-00-01).

(2)  
With all gear down and locked, place landing gear control lever in OFF position.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737 AMM 飞机维护手册 起落架 LANDING GEAR(118)