(5) Replace the 28CV (28CV) (Ref. AMM TASK 27-81-19-000-001) (Ref. AMM TASK 27-81-19-400-001),
(6) Move the slats Ref. Para.3.B.(2).
(7) Do a check of the A/C Wiring betwwen the SFCC 1 (2) ARINC tray interface and the slat FPPU (Ref. ASM 278106S01) (Ref. ASM 278107S01) electrical connnector.
(8) If there is a wiring/interface fault do the repair.
(9) Do the operational test of the slats system (Ref. AMM TASK 27-84-00-710-001)
5. Close-up
________
A. Remove the ground support and maintenance equipment, the special and standard tools and all other items.
B. Put the aircraft back to its initial configuration.
R Command Sensor Unit (CSU) Fault or wiring to SFCC 1(2) CSU Indicated by Flap or R Slat Channel.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Possible Causes
_______________
- CSU (51CV)
- SFCC-1 (21CV)
- SFCC-2 (22CV)
- A/C wiring between the SFCC 1(2) ARINC tray and the electrical connectors 51CV-A and 51CV-B
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 27-51-17-000-001 Removal of the Command Sensor Unit (CSU) (51CV)
AMM 27-51-17-400-001 Installation of the Command Sensor Unit (CSU) (51CV)
AMM 27-51-34-000-001 Removal of the SFCC (21CV,22CV)
AMM 27-51-34-400-001 Installation of the SFCC (21CV,22CV)
AMM 27-84-00-710-001 Operational Test of the Slat System
ASM 27-81/02
ASM 27-81/03
3. Fault Confirmation
__________________
A. Table of the circuit breakers used in this procedure:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
B. SFCC Reset and Initialization.
(1) At the circuit breakers.
(a) Open the circuit breakers.
(b) Wait for 3 seconds and close the circuit breakers.
(c) Wait for 60 seconds
(2) Do the operational test of the flaps system (Ref. AMM TASK 27-84-00-710-001)
(a) Check the UPPER ECAM and the SD FLT/CTL page for the fault warnings.
(b) If the ECAM warning clears. Access the SLT ON GROUND FAULTS page and make sure that the ground log is clear.
(c) If the ECAM warning and the SLT ON GROUND FAULTS message stays R displayed, do the fault isolation.
4. Fault Isolation
_______________
A. Procedure.
(1) Refer to step A.(2), and swap the electrical connectors 51CV-A and 51CV-B.
(a) If the fault moves to the other SFCC go to step 4.A.(2).
(b) If the fault remains in the same circuit do step 4.A.(4).
(2) Replace the CSU (51CV) (Ref. AMM TASK 27-51-17-000-001) (Ref. AMM TASK 27-51-17-400-001).
(3) Do the operational test of the slats system (Ref. AMM TASK 27-84-00-710-001).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-81-00∞∞∞∞∞∞∞∞∞∞Page 213
Aug 01/00 CES
(4) Swap the SFCC 1 and SFCC 2, (Ref. AMM TASK 27-51-34-000-001) for (Ref. AMM TASK 27-51-34-400-001) do Para.2,3 and 4 only.
(a) Access the SLT ON GROUND FAULTS and do a check of the ground log.
(b) If the fault moves with SFCC 1(2).
(c) Return the SFCC 1 (2) to their initial locations.
(d) Replace SFCC-1 (21CV) (SFCC-2 (22CV)) SFCC 1(2),
(5) Do the operational test of the slats system, reference step 4.A.(3).
(6) If the fault remains with same circuit, do step 4.A.(7).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 2(59)