(Activation for the BITE Test) R AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-94/03
3. Fault Confirmation
__________________
A. Test
(1) Do the operational test of the side stick assembly (activation for the BITE test) (Ref. AMM TASK 27-96-00-710-020).
(2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message:
L SPLR5 SERVO VLV 31CE9 OR OUTPUT FROM SEC2
- replace the SEC-2 (1CE2), (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
(1) If the fault continues:
- replace the servo valve of the servo control (31CE9), (Ref. AMM TASK 27-64-52-000-005) and (Ref. AMM TASK 27-64-52-400-005).
NOTE : The resistance must be 500 ohms +/- 10 %.
____
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-60-00∞∞∞∞∞∞∞∞∞∞Page 282
May 01/00 CES (2) If the fault continues:
- do a check and repair the wiring of the SV signal from the servo control (31CE9) to the SEC 2 (1CE2), (Ref. ASM 27-94/03).
B. Do the tests given in Para. 3.
Loss of the Right Spoiler 5 Servo Valve Signal for the SEC 2
1. Possible Causes
_______________
- SEC-2 (1CE2)
- servo valve of the servo control (31CE10)
- wiring of the SV signal from the servo control (31CE10) to the SEC 2 (1CE2)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 27-64-52-000-006 Removal of the Spoiler Servo-Control 32CE4
AMM 27-64-52-400-006 Installation of the Spoiler Servo-Control 32CE4
AMM 27-94-34-000-001 Removal of the SEC (1CE1,1CE2,1CE3)
AMM 27-94-34-400-001 Installation of the SEC (1CE1,1CE2,1CE3)
AMM 27-96-00-710-020 Operational Test of the Side Stick Assembly
(Activation for the BITE Test) R AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-94/03
3. Fault Confirmation
__________________
A. Test
(1) Do the operational test of the side stick assembly (activation for the BITE test) (Ref. AMM TASK 27-96-00-710-020).
(2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message:
R SPLR5 SERVO VLV 31CE10 OR OUTPUT FROM SEC2
- replace the SEC-2 (1CE2), (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
(1) If the fault continues:
- replace the servo valve of the servo control (31CE10), (Ref. AMM TASK 27-64-52-000-006) and (Ref. AMM TASK 27-64-52-400-006).
NOTE : The resistance must be 500 ohms +/- 10 %.
____
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-60-00∞∞∞∞∞∞∞∞∞∞Page 284
May 01/00 CES (2) If the fault continues:
- do a check and repair the wiring of the SV signal from the servo control (31CE10) to the SEC 2 (1CE2), (Ref. ASM 27-94/03).
B. Do the tests given in Para. 3.
Incorrect Position of the Left Spoiler 5
1. Possible Causes
_______________
- SEC-2 (1CE2)
- SERVO CTL-SPLR5, L G (31CE9)
- wiring
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------