• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-28 13:44来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 3. Fault Confirmation
__________________
 A. Job Set-Up
 (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).
 B. Test
 (1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
 4. Fault Isolation
_______________
 A. If the BITE test gives the maintenance message:
 ELAC1 OR WIRING FROM B HYD PRESS SW1
 or
 ELAC1 OR WIRING FROM B HYD PRESS SW2

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).
 (1) If the fault continues:
 - do a check and repair the wiring of the LOW BLUE PRESS signal from the ELAC 1 (2CE1) to the first terminal block, COM or MON part as shown in the maintenance message (the COM part is for the maintenance message ELAC 1 OR WIRING FROM B HYD PRESS SW 1 and the
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 235
 May 01/00 CES MON part is for the maintenance message ELAC 1 OR WIRING FROM B HYD PRESS SW 2) (Ref. ASM 27-92/27).


 B. Do the test given in Para. 3.
 5. Close-up________
 A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).


 Loss of the Blue Hydraulic Pressure Switch Signal for the ELAC 2
 1. Possible Causes
_______________
 - ELAC-2 (2CE2)

 - wiring of the LOW BLUE PRESS signal from the ELAC 2 (2CE2) to the first terminal block


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)
 AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)
 AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/27
 3. Fault Confirmation
__________________
 A. Job Set-Up
 (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).
 B. Test
 (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).
 4. Fault Isolation
_______________
 A. If the BITE test gives the maintenance message:
 ELAC 2 OR WIRING FROM B HYD PRESS SW1
 or
 ELAC 2 OR WIRING FROM B HYD PRESS SW2

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).
 (1) If the fault continues:
 - do a check and repair the wiring of the LOW BLUE PRESS signal from the ELAC 2 (2CE2) to the first terminal block, COM or MON part as shown in the maintenance message (the COM part is for the maintenance message ELAC 2 OR WIRING FROM B HYD PRESS SW 1 and the
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 237
 May 01/00 CES MON part is for the maintenance message ELAC 2 OR WIRING FROM B HYD PRESS SW 2) (Ref. ASM 27-92/27).


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 2(128)