• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 09:01来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2.93 and 3.27 m.daN).
 (15) Assemble the 2 piece cooling shroud on to the flange of the ignition lead and tighten with the shroud clamp.

 (16) TORQUE the shroud clamp to between 33 and 37 lbf.in (0.37 and 0.41 m.daN).

 (17) Route the ignition lead along the core engine, and install it into the 2 hinged clamps. Turn the attachment bolt one-quarter turn to engage the locking feature, and continue to tighten until the ignition lead cannot be moved in the clamp.


 Subtask 74-21-10-865-057
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1JH FOR 1000EM1 2JH1, 3JH1 FOR 1000EM2 2JH2, 3JH2
 F 『 EEFF : ALL E Page 41374-21-10
 E E Aug 01/04 E E ECES E Subtask 74-21-10-942-051

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 C. Remove the warning notice(s). Subtask 74-21-10-710-051
 D. Perform an operational test of the ignition system (Ref. TASK 74-00-00-710-043).
 5. Close-up
________ Subtask 74-21-10-410-057
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.

 (2) Close the thrust reverser doors: (Ref. TASK 78-36-00-410-040). FOR 1000EM1 451AL, 452AR FOR 1000EM2 461AL, 462AR


 Subtask 74-21-10-440-053
 B. Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041). Subtask 74-21-10-410-054
 C. Close the fan cowl doors: (Ref. TASK 71-13-00-410-040)
 FOR 1000EM1
 437AL, 438AR
 FOR 1000EM2
 447AL, 448AR

 F 『 EEFF : ALL E Page 41474-21-10
 E E Aug 01/03 ERE
ECES E

 F  『
 E  C F M  E
 E  E


 E 56-5B E
 E E
 IGNITION LEAD (RIGHT) - INSPECTION/CHECK


________________________________________
 TASK 74-21-10-200-002
 Inspection/Check of the Right Ignition Lead

R WARNING : BE SURE EXCITERS ARE DE-ENERGIZED FOR AT LEAST 5 MINUTES BEFORE
_______ R WORKING ON THE IGNITION SYSTEM. VOLTAGE OUTPUT CAN BE DANGEROUS. DO R NOT TOUCH THE ELECTRICAL CONTACTS, EXCITERS MAY CONTAIN AN ELECTRICAL R CHARGE EVEN WHEN THEY ARE NOT ENERGIZED.
R
 CAUTION : BE CAREFUL WITH THE IGNITION LEAD TO PREVENT DAMAGE TO THE CONDUIT
_______
 AND THE INTERNAL WIRES.

 1. Reason for the Job

__________________
 Self Explanatory


 2. Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notice

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No.  CP1011 *
 1,1,1 trichlorethane (Ref. 70-30-00)

 F 『 EEFF : ALL E Page 60174-21-10
 E E Aug 01/03 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 C. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 74-21-10-000-002 Removal of the Right Ignition Lead 74-21-10-300-005 Repair of the Burned or Pitted Igniter Contact 74-21-10-300-006 Replacement of the Ceramic Insulator Sleeve 74-21-10-300-007 Repair of the Chafe Guard 74-21-10-400-002 Installation of the Right Ignition Lead 78-30-00-081-041 Make the Thrust Reverser Serviceable after
 Maintenance 78-30-00-481-041 Make the Thrust Reverser Unserviceable for
 Maintenance 78-36-00-010-040 Opening of the Thrust Reverser Doors 78-36-00-410-040 Closing of the Thrust Reverser Doors 74-21-10-991-302 Fig. 601
 3. Job Set-up
__________
 Subtask 74-21-10-941-053
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3) On the overhead maintenance panel 50VU:

 (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM IGNITION 点火(19)