• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-27 13:25来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

36-11-01/401, Upper Strut Pneumatic Y-Duct

 (6)  
78-31-00/201, Thrust Reverser System


 B.  Access
 (1)  
Location Zones
 511 Leading edge to front spar (Left)
 521 Leading edge to front spar (Left)
 522 Slat No. 4 (Left)
 611 Leading edge to front spar (Right)
 621 Leading edge to front spar (Right)
 622 Slat No. 7 (Right)


 (2)  
Access Panels
 511KT
 521AB
 521UBX
 522JL
 522BL
 611KT
 621AB
 621UBX
 622JR
 622BR

 

 C.  Prepare for Removal
 S 864-002
 (1)  
Supply electrical power (Ref 24-22-00).

 S 864-003

 (2)  
Put the leading edge slats in the fully extended position. Use the electric or hydraulic drive systems (Ref 27-81-00).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-11-05
 ALL  ú ú 01 Page 401 ú Dec 20/89

A

757
MAINTENANCE MANUAL

SEEA
FWD
INBD
FLEXIBLE
COUPLING
SEE C
SLAT 4
LOWER TELESCOPING DUCT
SEE B UPPER TELESCOPING DUCT ASSY SEE D
A
BEARING LOWER TELESCOPING DUCT
BEARING SLAT 4 SLAT 4 INBOARDOUTBOARD TAI DUCTTAI DUCT SLAT
TAI DUCT FLANGE
TAI VALVE
ELECTRICAL SUPPORT CONNECTOR CLAMP
UPPER
WING TAI
TELESCOPING
VALVE
DUCT TAI VALVE FWD
TO UPPER STRUT DUCT
PNEUMATIC Y-DUCT
TAI VALVE CLAMP (DO NOT DISCONNECT)
INBD
B
Wing Telescoping Ducts Installation Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-11-05
 ALL  ú ú 01 Page 402 ú Sep 20/93

A
757
MAINTENANCE MANUAL

TAI DUCT SLAT 3 
COUPLING FLEXIBLE 
BOLT 
ASSEMBLY RETAINER 
FWD 
INBD  TAI DUCT OUTBOARD SLAT 4 

PLUG RIB  FLANGE 
END CAP 
PACKING 
FWD INBD BEARING END DUCT  DUCT TELESCOPING UPPER 0-RING  PACKING BEARING O-RING  RING BACKUP FROM TAI VALVE TAI DUCT  SEAL  RIB RING BACKUP 

Figure 401 (Sheet 2) Wing Telescoping Ducts Installation 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 防冰和排雨 CHAPTER 30 - ICE AND RAIN PROTECTION(33)