.
The location, operation and maintenance of wind recording equipment
.
Combined operations involving another installation or vessel in the vicinity of the installation with potential to disturb the airflow significantly or to emit hot exhaust into the flight path of a helicopter
.
The Safety Management System for an installation should set the standards and monitor compliance against a set of established operational requirements designed to minimise environmental hazards to helicopter operations
.
Standards to be attained and procedures to be used for monitoring the control of installation activities to ensure an acceptable level of safety for helicopter operations is maintained
.
Ensuring procedures are in place for communicating relevant information to helicopter operators in a timely manner, including any departure from agreed operational practice, which may have an adverse effect on helicopter safety.
Offshore safety requires co-operation between everyone who has a contribution to make to ensure health and safety on an offshore installation or the activities involving the installation. The scope of Regulation 8 of MAR is, therefore, very wide and includes operators, owners, concession owners, employers, employees, managers and people in charge of visiting vessels or aircraft.
5.4 PERFORMANCE ASSESSMENT AND REVIEW
When reviewing the assessments, helideck design and operability and the intended arrangements for helicopter operations should be assessed against current guidelines and good industry practice.
The overall scope of individual duty holder submissions will vary considerably, and the guidance given in this document may assist with assessing the completeness of the case for safety.
It is also important for the duty holder to have a good measure of the operability of a helideck and facilities design in terms of the proposed operating arrangements and the predicted operational performance (e.g. availability).
A performance assessment can be made using the template set out in Section 5.5.
5.5 TEMPLATE FOR A DESIGN AND OPERABILITY REPORT
5.5.1 Report Objectives
The objectives of a Design and Operability Report are:
1.
To present an overview of the facilities design and the provisions being made for supporting helicopter operations to and from an installation or vessel.
2.
To provide relevant information about the helideck and support systems design and operability, to enable the verification process to be completed.
3.
To achieve acceptance for flight operations by the helicopter operators (BHAB Helidecks) with minimum operating limitations.
4.
To provide a document that interfaces with the Safety Case and provides relevant operating information for helicopter crews and helideck teams.
5.5.2 Suggested Report Structure
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:离岸直升机起落甲板设计指南 OFFSHORE HELIDECK DESIGN GUIDELINES 1(19)