EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. GUN 011-999 ú
28-41-00
ú CONFIG ú 11 Page 22 ú Sep 28/00
A
757
MAINTENANCE MANUAL
TANK WIRING HARNESS FOR THE DENSITOMETER
IN THE LEFT OR RIGHT MAIN OR CENTER FUEL TANK
Fuel Quantity Indicating System Wiring
Figure 9 (Sheet 7)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. GUN 011-999 ú
28-41-00
ú CONFIG ú 11 Page 23 ú Sep 28/00
A
757
MAINTENANCE MANUAL
DENSITOMETER CONNECTOR
Fuel Quantity Indicating System Wiring Figure 9 (Sheet 8)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. GUN 011-999 ú
28-41-00
ú CONFIG ú 11 Page 24 ú Sep 28/00
A
757 MAINTENANCE MANUAL
PROCESSOR CONNECTOR HI-Z/LO-Z(ARING 600 RECEPTACLE
CONNECTOR) HI-Z/LO-Z PLUG
PROCESSOR LEFT OR RIGHT MAIN FUEL TANK
LO-Z AND HI-Z WIRING FOR THE LEFT OR RIGHT MAIN FUEL TANK
Fuel Quantity Indicating System Wiring
(Simplified Schematic)
Figure 9 (Sheet 9)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. GUN 011-999 ú
28-41-00
ú CONFIG ú 11 Page 25 ú Sep 28/00
A
757 MAINTENANCE MANUAL
(17)
The LO-Z wiring is individually routed from the processor to the tank units and compensators.
(18)
The HI-Z wiring is connected in "daisy chain" between the tank units and compensator with only one HI-Z wire terminal at the HI-Z/LO-Z connector. One HI-Z wire goes from the HI-Z/LO-Z connector to the processor.
(19)
The tank wiring harness does not require FQIS field calibration.
(20)
The end terminals of the tank wiring harness at the tank units, compensators or densitometers can be repaired by replacement of the end terminals. All other damage to the tank wiring harness will result in replacement of the harness.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 燃油 CHAPTER 28 - FUEL 4(118)