THE NEW PIPER AIRCRAFT, INC.
PA-44-180
AIRPLANE MAINTENANCE MANUAL
LIST OF ILLUSTRATIONS (cont)
FIGURE N0. SUBJECT GRID NO.
28-4. Fuel Filter Assembly 2E12
28-5. Fuel Selector Valve 2E13
28-6. Fuel Gauge 2E16
28-7. Fuel Pressure Gauge and Calibration 2E17
29-1. Schematic Diagram of Hydraulic System 2F3
29-2. Hydraulic Pump (Sheet 1 of 2) 2F13
29-2. Hydraulic Pump (Sheet 2 of 2) 2F14
29-3. Nose Gear Actuating Cylinder 2F17
29-4. Main Gear Actuating Cylinder 2F19
29-5. End Gland Locking Device (Main Gear) 2F19
29-6. Hydraulic Lines Installation 2F22
30-1. Pitot Heat 2G5
32-1. Main Gear Oleo Strut Assembly 2G23
32-2. Main Gear Service Tolerances 2H2
32-3. Main Gear Installation 2H8
32-4. Aligning Main Gear 2H13
32-5. Nose Gear Oleo Strut Assembly 2H16
32-6. Nose Gear Installation 2H18
32-7. Nose Gear Service Tolerances 2H20
32-8. Nose Gear Downlock and Eccentric Bushing Installation 2I3
32-9. Nose Gear Adjustment 2I6
32-10. Clamping Rudder Pedals in Neutral Position 2I8
32-11. Rudder Pedals at Neutral Angle 2I8
32-12. Mechanical Nose Gear Door Mechanism 2I10
32-13. Nose Wheel Assemblies 2I13
32-14. Main Wheel Assembly 2I15
32-15. Wheel Brake Assembly 2I17
32-16. Removal and Installation of Anchor Bolts 2I18
32-17. Brake Installation 2I20
32-18. Parking Brake Valve Assembly 2I22
32-19. Gar-Kenyon Brake Master Cylinder (1700) 2J2
32-20. Cleveland Brake Master Cylinder (10-30) 2J2
32-21. Toe Brake Installation 2J5
32-22. Adjustment of Main Gear Down Limit Switch 2J9
32-23. Adjustment of Nose Gear Down Limit Switch 2J9
32-24. Throttle Warning Switches 2J11
34-1. Pitot-Static System Installation 2K7
37-1. Vacuum System Installation 2L7
37-2. Vacuum Regulator 2L12
39-1. Annunciator Panel Installation 3B7
39-2. Electric Clock Installation 3B9
Introduction Page 16
Revised: February 28, 2002
3A20
THE NEW PIPER AIRCRAFT, INC.
PA-44-180
AIRPLANE MAINTENANCE MANUAL
LIST OF ILLUSTRATIONS (cont)
FIGURE N0. SUBJECT GRID NO.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:西门诺尔飞机维护手册 simenole PA-44-180 AMM 2(36)