71  POWER PLANT  3F15 
00 10 20 60  General Cowling Mounts Air Intakes 
73  ENGINE FUEL SYSTEMS  3G15 
10 20 30  Distribution Controlling Indicating 

Introduction Page 12
Revised: February 28, 2002
3A16
THE NEW PIPER AIRCRAFT, INC.
PA-44-180
AIRPLANE MAINTENANCE MANUAL

SYSTEM / CHAPTER INDEX GUIDE 
SYSTEM / CHAPTER  SUB-SYSTEM / SECTION  TITLE  GRID NO. 
74  IGNITION  3H5 
00 10 20 30  General Electrical Power Supply Distribution Switching 
77  ENGINE INDICATING  3I11 
00 10 20 30  General Power Temperature Analyzers 
78  EXHAUST  3J1 
00  General 
79  OIL  3J7 
20 30  Distribution Indicating 
80  STARTING  3K1 
00 10  General Cranking 
91  CHARTS AND WIRING DIAGRAMS  4B1 
00 10 20  General Special Tools Electrical Schematics 

Introduction Page 13 Revised: February 28, 2002
THE NEW PIPER AIRCRAFT, INC.
PA-44-180
AIRPLANE MAINTENANCE MANUAL

LIST OF ILLUSTRATIONS 
FIGURE NO.  SUBJECT  GRID NO. 
6-1.  Three View  1C22 
6-2.  Station References  1C23 
6-3.  Access Plates and Panels  1D2 
7-1.  Jacking  1D9 
8-1.  Leveling Airplane  1D15 
8-2.  Weighing  1D17 
11-1.  Exterior Placards and Markings  1E15 
11-2.  Interior Placards and Markings  1E17 
12-1.  Service Points  1F9 
12-2.  Lubrication Chart - Landing Gear, Main  1F22 
12-3.  Lubrication Chart - Landing Gear, Nose  1G2 
12-4.  Lubrication Chart - Control System, Part 1  1G4 
12-5.  Lubrication Chart - Control System, Part 2  1G6 
12-6.  Lubrication Chart - Power Plant and Propeller  1G8 
12-7.  Lubrication Chart - Cabin Door, Baggage Door and Seats  1G10 
20-1.  Torque Wrench Formula  1G17 
20-2.  Method of Installing Rod End Bearings  1G18 
20-3.  Cherrylock Rivet Removal  1G19 
20-4.  Identification of Aircraft Fluid Lines  1G21 
21-1.  Cabin Environmental System Installation  1H13 
21-2.  Heater and Combustion Air Blower Assembly  1H14 
21-3.  Diagrammatic Cutaway of Heater to Show Whirling Flame Action  1H15 
21-4.  Fuel Regulator and Shutoff Valve  1H16 
21-5.  Top View - Duct Switch  1H16 
21-6.  Intake Valve and Switches  1H17 
21-7.  Wiring Diagram (Heater)  1H21 
21-8.  Primary Power Circuit (Heater)  1H22 
21-9.  Starting Power Circuit (Heater)  1H23 
21-10.  Spark Plug Fixture (Heater)  1I1 
21-11.  Wiring - Test Setup (Heater)  1I1 
21-12.  Spark Plug Gap Adjustment (Heater)  1I2 
21-13.  Ignition Unit Assembly (Heater)  1I6 
21-14.  Test Setup for Fuel Regulator and Shutoff Valve (Heater)  1I9 
21-15.  Heater Fuel Pump  1I10 
21-16.  Suggested Design for Seal Plates, Plugs, and Caps for 
Combustion Tube leakage Test  1I14 
21-17.  Test Setup for Combustion Air Pressure Switch  1I14 
21-18.  Exploded View of Heater Assembly  1I19 
21-19.  Exploded View - Combustion Air Blower and Motor Assembly  1I22 
21-20.  Suggested Setup of Heater Operation Test  1I24 

Introduction Page 14
Revised: February 28, 2002
3A18
THE NEW PIPER AIRCRAFT, INC.
PA-44-180
AIRPLANE MAINTENANCE MANUAL

LIST OF ILLUSTRATIONS (cont) 
FIGURE NO.  SUBJECT  GRID NO. 
21-21.  Wiring Connections for Heater Operation Test  1I24 
21-22.  Spark Plug Gap Adjustment Tool  1J3 
21-23.  Heater Hourmeter Installation  1J4 
24-1.  Lamp Bank load  1J24 
24-2.  Battery Box  1K2 
24-3.  Electrical Component Location (Lamar Model No. B-00392-1)  1K5 
24-4.  Lamar B-00392-1 Regulator Overvoltage Test Method  1K6 
25-1.  Seat Back Lock  1K13 
25-2  Lumbar Seat Bladder Installation  1K15 
25-3.  Artex 110 ELT  1K18 
25-4.  Artex ELT 110 Wiring Schematic  1K19 
 