• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-21 08:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 TASK 26-16-02-024-001
 2.  Remove the Smoke Detector Blower (Fig. 401)________________________________
 A.  References
 (1)  
AMM 24-22-00/201, Electrical Power - Control

 (2)  
AMM 52-34-00/201, No. 1 and No. 2 Cargo Doors


 B.  Access
 (1)  
Location Zones
 121/122 Forward Cargo Compartment
 153/154 Aft Cargo Compartment
 211/212 Flight Compartment
 820 Lower Half of Fuselage


 (2)  
Access
 821 No. 1 Cargo Compartment Door
 822 No. 2 Cargo Compartment Door

 

 C.  Do the Procedure to Remove the Smoke Detector Blowers.
 S 864-003
 (1)  
Open these circuit breakers on the overhead circuit breaker panel, P11, and attach DO-NOT-CLOSE tags:

 (a)  
11S35, FIRE DET CARGO CONTor CARGO SMOKE BLOWER CONT

 (b)  
11S36, FIRE DET FAN PWR or CAR SMK BLO

 

 (2)  
Open forward and aft cargo doors (AMM 52-34-00/201).

 (3)  
Get access to the blower.

 (4)  
Remove the electrical connector.

 S 034-008

 (5)  
Remove the tiedown strap which holds the plastic tube to the blower air port.

 (6)  
Remove the plastic tube from the air port.


 S 014-051
 S 014-004
 S 034-006
 S 034-007
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-16-02
 ALL  ú ú 01 Page 401 ú Jan 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

FWD SEE A
SEE B
SEE C
FORWARD CARGO COMPARTMENT A
SEE D
FWD
AFT CARGO COMPARTMENT 
SCREW 
WASHER  PLASTIC  B 
(4 LOCATIONS)  TUBE 

TIEDOWN STRAP
SPACER BLOWER
ELECTRICAL CONNECTOR
SMOKE DETECTOR INSTALLATION AFT CARGO COMPARTMENT
PLASTIC
TUBE
D
SCREW WASHER (4 LOCATIONS)
ELECTRICAL
CONNECTOR
TIEDOWN STRAP
SPACER
SMOKE DETECTOR INSTALLATION
FORWARD CARGO COMPARTMENT FWD
C
BLOWER
Cargo Smoke Detector Blower Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-16-02
 ALL  ú ú 01 Page 402 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 S 034-009
 (7)
Remove the four screws and washers.

 S 024-014

 (8)
Remove the blower and spacers below the blower mounting pads.


 TASK 26-16-02-424-011
 3.  Install the Smoke Detector Blower (Fig. 401)_________________________________
 A. References
 (1)
AMM 24-22-00/201, Electrical Power - Control

 (2)
AMM 52-34-00/201, No. 1 and No. 2 Cargo Doors


 B. Access
 (1)  
Location Zones
 121/122 Forward Cargo Compartment
 153/154 Aft Cargo Compartment
 211/212 Flight Compartment
 820 Lower Half of Fuselage


 (2)  
Access
 821 No. 1 Cargo Compartment Door
 822 No. 2 Cargo Compartment Door

 

 C. Install the Smoke Detector Blower
 S 434-012
 (1)
Put the spacers below the blower mounting pads.

 S 424-013

 (2)
Install the blower with the four screws and washers.

 S 434-015

 (3)
Install the plastic tube on the blower air port.


 NOTE: The tube must move over the air port for approximately
____ 0.7 inch (1.8 cm).
 S 434-016
 (4)
Tighten the plastic tube to the air port. Use the tiedown strap.

 (5)
Install the electrical connector.


 S 434-017
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 防火 FIRE PROTECTION 1(89)