70-24-04
ALL ú ú N01 Page 202 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
CAUTION:_______ THE LARGE SPANNER NUTS FREQUENTLY HAVE SMALL BURRS AT THE
SPANNER SLOTS. THESE NUTS ATTACH THE MAIN BEARINGS OR THE
SEALS TO THE SHAFTSAND HOUSINGS. DO NOT INSTALL A SPANNER
NUT REARWARD. THIS CAN CAUSE DAMAGE TO THE FACE OF THE
BEARING OR THE SEAL.
(b)
Examine the spanner nut for burrs.
(c)
Remove the burrs from the spanner nut before you install the nut.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
70-24-04
ALL ú ú N01 Page 203 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
ELECTRICAL HARNESSES - MAINTENANCE PRACTICES
____________________________________________
1. General
_______
A. This task gives the steps to install some lockstitch on the electrical harnesses. It also gives the procedure to tighten the electrical connectors.
TASK 70-24-05-402-001-N00
2. Lockstitch Installation (Fig. 201)
_______________________
Lockstitch Installation
Figure 201
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
70-24-05
ALL ú ú N01 Page 201 ú Jun 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A. Consumable Materials
(1)
G00000 Lockstitch
B.
Access
(1)
Location Zones
410 Engine 1
420 Engine 2
430 Engine 3
440 Engine 4
C.
Procedure
S 422-005-N00
(1) Install the lockstitch on the wire bundle.
(a)
Attach the lockstitch on the wire bundle at distances not more than 2.0 inches (50.8 mm) apart.
(b)
Use a clove hitch with an added loop followed by a square knot to make the lockstitch knot.
NOTE:____The knots must be tight to the wire bundle. The knots must not cause unusual stress or damage.
(c)
If the wire bundle diameter is more than 1.5 inches (38.1 mm), attach the lockstitch two times at each location.
(d)
Cut the ends of the lockstitch to a length of 0.25-0.50 inches (6.35-12.7 mm).
TASK 70-24-05-402-017-N00
3. Tighten the Electrical Connectors_________________________________
A. Equipment
(1)
Wrench, Strap, TG-70
(2)
Pliers, Soft Jawed, TG-69
B.
Consumable Materials
(1)
Solvent, Dielectric (PMC 8910) (P11-054)
(2)
Solvent, Cleaner ((PMC 8914) (P11-055)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
70-24-05
ALL ú ú N01 Page 202 ú Jun 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
(3)
Solvent, Cleaner (SPMC 156) (P11-056)
(4)
Solvent, Cleaner (SPMC 168) (P11-057)
(5)
Solvent, Cleaner (SPMC 175) (P11-058)
(6)
Solvent, Cleaner (SPMC 176) (P11-059)
(7)
Solvent, Cleaner (SPMC 179) (P11-060)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 STANDARD PRACTICES - ENGINE(39)