• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 22:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

20-45-22 CORRECTION/ADDITION/AMPLIFICATION ALL 1, 5-ADDED ABS0206 AND ABS0207 ASSOCIATED ITEMS. 41
20-46-10 CORRECTION/ADDITION/AMPLIFICATION ALL 26-42, REVISED P/N IDENTIFICATION AND 44-46, CHARACTERISTICS. 49-52
20-46-50 CORRECTION/ADDITION/AMPLIFICATION ALL 1, 4-REVISED TITLE 5, 14-
16
20-48-11 CORRECTION/ADDITION/AMPLIFICATION ALL 1, 4-IMPROVED PROCEDURE 7, 10,
 13, 16-21, 24-33

 20-HIGHLIGHTS Page 4 of 7 REVISION NO. 09 Apr 01/05 CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES


20-48-12 CORRECTION/ADDITION/AMPLIFICATION 1, 4-ADDED WIRE TYPE ABS0949AD. 5, 8-
19
20-48-14 CORRECTION/ADDITION/AMPLIFICATION 1-2, REVISED FIGURE: TERMINAL LUGS - STRIPPING, 19 EXTRACTION AND CRIMPING TOOLS - ABS0231.
20-48-20 CORRECTION/ADDITION/AMPLIFICATION 1 ADDED ABS1380, ABS1381 AND ABS1493.
20-48-21 CORRECTION/ADDITION/AMPLIFICATION
5, 7, TEXT UPDATED
 10, 12,
 25-26,
 31

20-48-23 CORRECTION/ADDITION/AMPLIFICATION 1, 10-TEXT MODIFICATION 14
20-48-24 CORRECTION/ADDITION/AMPLIFICATION 1-42 ADDED ABS1380, ABS1381 AND ABS1493.
20-48-25 CORRECTION/ADDITION/AMPLIFICATION 1, 3-ADDED ABS1438. 28
20-48-30 CORRECTION/ADDITION/AMPLIFICATION 1-2 ADDED TWINAX CONTACTS. TITLE OF TOPIC UPDATED
20-48-31 Layout Improved 1
20-48-32 Effectivity updated 1, 4, CORRECTION/ADDITION/AMPLIFICATION 7-8, REVISED FIGURE
 11, 13-28, 33,
 37

20-48-35 NEW TOPIC/NEW CONFIGURATION 1-6
20-51-00 CORRECTION/ADDITION/AMPLIFICATION 1 REVISED TEXT.
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL 
ALL
ALL
ALL
 20-HIGHLIGHTS Page  5 of  7
 REVISION NO. 09  Apr 01/05 

 

CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES
20-51-50  Effectivity updated
 1-2  CORRECTION/ADDITION/AMPLIFICATION 
"WARNING CODE" MOVED 
20-53-00  CORRECTION/ADDITION/AMPLIFICATION 
1  NOTE ADDED 
20-53-20  CORRECTION/ADDITION/AMPLIFICATION 
1-3  WARNING AND CAUTION MOVED,
 WORDS DEFINITION UPDATED. 
20-53-21  TECHNICAL CORRECTIONS 
1-19  WIRE TYPE ADDED
 CORRECTION/ADDITION/AMPLIFICATION 
REVISED FIGURE 
20-53-22  CORRECTION/ADDITION/AMPLIFICATION 
1-28  REVISED FIGURE . 
20-53-23  CORRECTION/ADDITION/AMPLIFICATION 
1-11  ADDED NEW P/NS.
 TITLE OF TOPIC UPDATED 
20-53-24  CORRECTION/ADDITION/AMPLIFICATION 
2, 4- REVISED TITLE AND FIGURE
 5 
20-53-25  TECHNICAL CORRECTIONS 
1-22  TOPIC UPDATED.
 CORRECTION/ADDITION/AMPLIFICATION 
REVISED TITLE AND FIGURE
 TITLE OF TOPIC UPDATED 
20-53-26  CORRECTION/ADDITION/AMPLIFICATION 
1-5  REVISED FIGURE 
20-53-29  CORRECTION/ADDITION/AMPLIFICATION 
2, 6- REVISED FIGURE
 7, 10 
20-53-32  CORRECTION/ADDITION/AMPLIFICATION 
1-24  REVISED P/N LIST OF METALLIC CONDUITS 
20-53-41  CORRECTION/ADDITION/AMPLIFICATION 
1-13  CORRECTED NSA935504. 
20-53-45  NEW TOPIC/NEW CONFIGURATION 

ALL
ALL
ALL
ALLALL
ALL
ALLALL ALL
ALLALLALL ALL
ALL
ALL
ALL
ALL 20-HIGHLIGHTS Page REVISION NO. 09  6 of 7Apr 01/05 

 

CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES
1-3
20-53-52 Topic cancelled 1-3
20-55-30 Layout Improved 1-2

 20-HIGHLIGHTS Page 7 of REVISION NO. 09 Apr 01/05

 __________
CHAPTER 20
 STANDARD PRACTICES-AIRFRAME
 _______________________
LIST OF EFFECTIVE PAGES N, R or D indicates pages which are New, Revised or Deleted respectively Remove and insert the affected pages and complete the Record of Revisions and
 the Record of Temporary Revisions as necessary 
CH/SE/SU  C  PAGE  DATE  CH/SE/SU  C  PAGE  DATE  CH/SE/SU  C  PAGE  DATE 
RECORD  T. of C.  R  38 Apr01/05  20-00-00  R  13 Apr01/05 
OF TEMP.  T. of C.  R  39 Apr01/05  20-00-00  R  14 Apr01/05 
REVISION  T. of C.  R  40 Apr01/05  20-00-00  R  15 Apr01/05
 T. of C.  R  41 Apr01/05  20-00-00  R  16 Apr01/05 
L.E.P.  R 1-16 Apr01/05  T. of C.  R  42 Apr01/05  20-00-00  R  17 Apr01/05 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 ESPM Electrical Standard Practices Manual 1(2)