(2)
Make sure that the engine cowls are closed.
(3)
Make sure that the safety pins are installed on the nose landing gear and the main landing gear (Ref. TASK 32-00-00-481-001).
(4)
Install the PIN (D23156000).
(5)
On the N/W-steering deactivation electrical-box 5GC:
-set the ground-towing control lever to the towing position. (Ref. Fig. 206/TASK 09-10-00-991-005)
(6)
Do an EIS start procedure (Ref. TASK 31-60-00-860-001).
(7)
On the upper ECAM DU, on the MEMO page:
-the N WHEEL STEERG DISC indication comes into view.
EFF : ALL 09-10-00Page 243 Aug 01/05R CES
(8) On the panel 400VU:
R - make sure that the pressure indication on the yellow brake-pressure triple-indicator is correct: 3000 psi (206.8427 bar). The pointer must be in the green range.
-if necessary, pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).
NOTE : A pressure of 3000 psi (206.8427 bar) lets you operate the
____
brake seven times.
(9) On the panel 110VU:
-set the PARKING BRK control-switch to OFF.
Subtask 09-10-00-210-064
B. Aircraft Stability
(1)
Make sure that the aircraft is stable (Ref. TASK 05-57-00-200-001). Subtask 09-10-00-020-050
C. Removal of Components
(Ref. Fig. 211/TASK 09-10-00-991-017)
(1)
Remove the nuts (1), the washers (2) and the bolts (3).
(2)
Remove the block (4).
(3)
Remove the split pin (7), nut (6) and washer (5).
(4)
Remove the bolt (9) and sleeve (8).
(5)
Disconnect the rod end of the lower slave link sub-assembly.
Subtask 09-10-00-480-053
D. Installation of the Towing Attachment and Towing Cable
(Ref. Fig. 212/TASK 09-10-00-991-015)
WARNING : MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR
_______
SAFETY PINS ARE INSTALLED.
(1)
Install the ATTACHMENT DE-BOGGING (98D09104001000) on each main landing gear.
(2)
Install the CABLE, TOWING - MLG (98A09001002000) or CABLE, TOWING -MLG (98A09003500000) on the rear fittings of the main landing gear.
(3)
Connect the CABLE, TOWING - MLG (98A09001002000) or CABLE, TOWING -MLG (98A09003500000) to the tractor.
(4)
Install the BAR - STEERING NOSE WHEEL (98A09003000001) on the nose landing gear.
Lower Slave Link Sub-Assembly Figure 211/TASK 09-10-00-991-017
EFF : R CES ALL 09-10-00 Page 245 Aug 01/05
Debogging Attachment Figure 212/TASK 09-10-00-991-015
EFF : R CES ALL 09-10-00 Page 246 Aug 01/05
Subtask 09-10-00-860-059
E. Set the Lighting System and the Communication System to this
Configuration:
(1)
On the panel 25VU:
-
set the EXT LT/NAV & LOGO switch to ON,
-
set the EXT LT/BEACON switch to ON,
-
set the INT LT/DOME switch to BRT.
(2)
VHF System
-If communication is necessary between the aircraft and the control tower, on the RMP (Radio Management Panel) 11VU, push the VHF1 pushbutton switch. On the panel 60VU, connect a boomset.
(3)
Flight Interphone System
-On the panel 108VU, connect a boomset to the FLT INT socket. This connects you to the cockpit.
4. Procedure
_________
Subtask 09-10-00-584-053
A. Towing
WARNING : MAKE SURE THAT WHEN THE AIRCRAFT MOVES WITH ITS POWER ON THE
_______
GROUND
-
NO PERSONS GO WHERE THE AIRCRAFT CAN CAUSE THEM INJURY OR CAN KILL THEM
-
NO OBJECTS STAY WHERE THE ENGINES CAN BLOW THEM AWAY OR CAN PULL THEM INTO THE ENGINES BY SUCTION.
WARNING : MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR
_______
SAFETY PINS ARE INSTALLED.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM TOWING & TAXIING(12)