1EFF : ALL 1 05-51-13Page 610 1 1 May 01/02R 1 1 1CES 1
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| | 1 | 2 | 3 |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| | | | (1) Do a detailed visual inspection of| | X | | | | | | | the flap track No.2 to No. 4 beams| | | | | | | | | Aft attachment (pay particular | | | | | | | | | attention to the failsafe devices | | | | | | | | | and the spigot pin). | | | | | | | | | (Ref. TASK 57-26-00-200-001). | | | | | | | | | NOTE: Make sure that the clearence| | | | | | | | | at failsafe pins (adjacent | | | | | | | | | to the spigot) is correct. | | | | | | | | | (2) Do a detailed visual inspection of| | X | | | | | | | the flap tracks No. 2 to No.4 | | | | | | | | | beams Fwd attachment (pay | | | | | | | | | particular attention to the | | | | | | | | | failsafe devices and the spigot | | | | | | | | | pin). | | | | | | | | | (Ref. TASK 57-26-00-200-006) | | | | | | | | | (3) Defuel the wing tank | | X | | | | | | | (Ref. TASK 28-25-00-650-001). | | | | | | | | | (4) Examine the ribs 6, 12 and 19 and | | X | | | | | | | the rear spar for distortion, | | | | | | | | | cracks and damaged sealant fillets| | | | | | -------------------------------------------------------------------------------
Subtask 05-51-13-210-054
D. Inspection of the Slat System
(Ref. Fig. 605/TASK 05-51-13-991-004, 606/TASK 05-51-13-991-003)
(Ref. TASK 27-84-00-200-001) (Ref. TASK 27-84-00-210-001)
(Ref. TASK 28-25-00-650-001) (Ref. TASK 28-10-00-910-002)
-------------------------------------------------------------------------------|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| | 1 | 2 | 3 |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| |1. | | Inspection of the slat assemblies and | | | | | | | | | slat transmission | | | | | | | | | | | | | | | | A.| | Examine the slats for distortion, | X | | | | | | | | cracks, pulled or torn fasteners, | | | | | | | | | skin/honeycomb-core delamination and | | | | | | | | | damaged paintwork. | | | | | | | | | | | | | | | | B.| | Examine the hold-down stop-bracket and| X | | | | |
1EFF : ALL 1 05-51-13Page 611 1 1 May 01/02R 1 1 1CES 1
R R Component Location of the Slat System Figure 605/TASK 05-51-13-991-004
1EFF : 1 1 1CES ALL 1 111 05-51-13 Page 612 May 01/00
Slat Components Figure 606/TASK 05-51-13-991-003
1EFF : 1 1R 1CES ALL 1 11 1 05-51-13 Page 613 May 01/00
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 4(21)