-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| | 1 | 2 | 3 |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |----|----|---------------------------------------|-----|-----|-----|----|----|
| | | did not sink into the ground | | | | | |
| | | and the MLG did not find an | | | | | |
| | | obstacle on its path). | | | | | |
| | | (2) If the initial inspection shows | X | | | | |
| | | unsatisfactory condition(s): | | | | | |
| | | (a) Remove the MLG, the side-stay,| | X | | | |
| | | lockstay assembly and lockstay| | | | | |
| | | actuator for overhaul: | | | | | |
| | | (Ref. TASK 32-11-11-000-001) | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturer's | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure) | | | | | |
| | | (b) On the aircraft, examine the | | X | | | |
| | | attachment fittings and | | | | | |
| | | bearings of the side-stay for | | | | | |
| | | distortion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |
| | | (c) On the aircraft, examine the | | X | | | |
| | | attachment fittings of the MLG| | | | | |
| | | for distortion, cracks and | | | | | |
| | | damaged paintwork | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |
| | | (d) Examine the MLG actuating | | X | | | |
| | | cylinder and its attachment | | | | | |
| | | fitting for distortion, cracks| | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the actuating | | | X | | |
| | | cylinder for strip-down | | | | | |
| | | inspection | | | | | |
| | | (Ref. TASK 32-31-46-000-001)| | | | | |
| | | (refer to the manufacture's | | | | | |
| | | instructions for the | | | | | |
1EFF : ALL 1 05-51-24Page 615 1 1 Feb 01/99R 1 1 1CES 1
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| | 1 | 2 | 3 |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |----|----|---------------------------------------|-----|-----|-----|----|----|
| | | strip-down inspection | | | | | |
| | | procedure) | | | | | |
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 4(80)