• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-11 09:59来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 

 -------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
 | |CODE| |  1  |  2  |  3  |SIGN|FIG.|
 |----|----|---------------------------------------|-----|-----|-----|----|----|

R  |  |  |  self-blanking unions and bleed |  |  |  |  |  | 
R  |  |  |  screws.  |  |  |  |  |  | 
R  |  |  |  (b) Clean the piston housing with  |  |  |  |  |  |
 |  |  |  a cloth and make sure it is in |  |  |  |  |  |
 |  |  |  the correct condition (no  |  |  |  |  |  |
 |  |  |  separation, no blisters).  |  |  |  |  |  | 
R  |  |  |  (c) Make sure that the heat pack is|  |  |  |  |  |
 |  |  |  serviceable:  |  |  |  |  |  |
 |  |  |  - carbon integrity  |  |  |  |  |  |
 |  |  |  - free movement of the rotor  |  |  |  |  |  | 
R  |  |  |  discs  |  |  |  |  |  |
 |  |  |  - cracks or signs of oxidation |  |  |  |  |  | 
R  |  |  |  on the part of the rotor  |  |  |  |  |  | 
R  |  |  |  discs you can see.  |  |  |  |  |  | 
R  |  |  |  NOTE: Be careful with the  |  |  |  |  |  |
 |  |  |  discs to prevent damage|  |  |  |  |  |
 |  |  |  to the protective  |  |  |  |  |  |
 |  |  |  finish (anti-oxidation |  |  |  |  |  | 
R  |  |  |  paint).  |  |  |  |  |  |
 |  |  |If you find damage:  |  |  |  |  |  | 
R  |  |  |- Remove the damaged brake unit for  |  |  X  |  |  |  | 
R  |  |  |  overhaul  |  |  |  |  |  | 
R  |  |  |  (Ref. TASK 32-42-27-000-001).  |  |  |  |  |  | 
R  |  |  |  (Refer to the manufacturer's  |  |  |  |  |  | 
R  |  |  |  instructions for the overhaul  |  |  |  |  |  | 
R  |  |  |  procedure).  |  |  |  |  |  |
 |  |  |(3) Installation of the removed  |  |  |  |  |  |
 |  |  |  components  |  |  |  |  |  | 
R  |  |  |  (a) Install serviceable components:|  |  |  |  |  |
 |  |  |  - for the wheels  |  |  |  |  |  |
 |  |  |  (Ref. TASK 32-41-11-400-006)  |  |  |  |  |  |
 |  |  |  - for the brakes  |  |  |  |  |  | 
R  |  |  |  (Ref. TASK 32-42-27-400-001).  |  |  |  |  |  |
 |  |  |  |  |  |  |  |  | 
R  |  B.|  |Inspection after the melting of the  |  |  |  |  |  | 
R  |  |  |183 deg.C (361.4 deg.F) or 300 deg.C  |  |  |  |  |  | 
R  |  |  |(572 deg.F) fuse plug(s) and/or the  |  |  |  |  |  | 
R  |  |  |reported cockpit indication of the  |  |  |  |  |  | 
R  |  |  |brakes temperature equal to or more  |  |  |  |  |  | 
R  |  |  |than 900 deg.C (1652 deg.F)  |  |  |  |  |  |
 |  |  |  |  |  |  |  |  |
 |  |  |(1) Remove the related wheel for  |  X  |  |  |  |  |
 |  |  |  overhaul  |  |  |  |  |  | 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 4(38)