• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-22 12:16来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

section of the parts being processed.
For Painting and Chemical Conversion Coating, coupons may be sheet material of similar alloy as the parts being processed
with minimum size of 3” x 5” x .025”
The seller shall supply a minimum of two test coupons, 1" X 1" X 9" or 1" diameter X 9", for each heat number shipped. The
minimum size of the test coupons can be 5/8" X 5/8" X 3 1/4" or 5/8" diameter X 3 1/4". The coupons shall have the same
processing histories as the end product. For forged or ring rolling products, a prolongation with sufficient size for making those
coupons in two different directions is required.
349.3 Clearwater Orders Only
Test bars shall be provided when specified per the blueprint requirements.
Revisions: No changes.
Aerospace
Supplemental Purchase Order Conditions (SPOC) Manual
UNCONTROLLED IN HARDCOPY
Revision H Effective Date: 15 January 2009 74
*Revised / **Added
SPOC 354 – Electro-Static Discharge Requirement *
For ESDS (Electrostatic Discharge Sensitive) items, the Supplier shall establish and maintain a written electrostatic discharge
control program for the control of Electro-Static Discharge (ESD) during fabrication, handling, and packaging of electrical and
electronic parts, assemblies, and equipment. The program must comply with the requirements of the most current version of
Mil-Std-1686, or equivalent. ESDS Packaging requirements are found in SPOC 239.
Revisions: Reference to ESDS packaging requirements added. Clearwater only requirements removed.
SPOC 385 – Printed Circuit Board (PCB) Testing
The Supplier shall perform continuity and circuit short testing on all double-sided and multi-layer Printed Circuit Boards (PCBs)
before shipping to Honeywell.
Revisions: No changes.
SPOC 386 – QQ-A-200 Certification – CANCELLED
Revisions: SPOC cancelled.
SPOC 387 – Solder Mask Requirement – CANCELLED
Revisions: SPOC cancelled.
SPOC 388 – Cost Recovery from Suppliers – CANCELLED
Revisions: SPOC cancelled.
*Revised / **Added
SPOC 406 – Commercial Items Used in Government Contracts *
This part has been determined to meet the definition of FAR 2.101, “Commercial Items”.
The following terms apply as designated below. Supplier must also insert these clauses in all lower-tier subcontracts as required
by the clause. Unless otherwise stated, all references to “Contracting Officer’ will mean the Honeywell “Buyer”.
Aerospace
Supplemental Purchase Order Conditions (SPOC) Manual
UNCONTROLLED IN HARDCOPY
Revision H Effective Date: 15 January 2009 75
Defense Priority and Allocation Requirements (Sept 1990) 52.211-15 If the face of this Order indicates that it is a
DPAS rated order.
Utilization of Small Business Concerns (May 2004) 52.219-8 All
Equal Opportunity (May 2007)* 52.222-26 All
Affirmative Action for Special Disabled Veterans, Veterans of
the Vietnam Era and Other Eligible Veterans (Sep 2006)*
52.222-35 If value of this order is $25,000 or more.
Affirmative Action for Workers with Disabilities (June 1998) 52.222-36 If value of this order is $10,000 or more.
Notification of Employee Rights Concerning Payment of
Union Dues or Fees (Dec 2004)
52.222-39 If value of this order is $100,000 or more.
Preference for Privately Owned U.S.-Flag Commercial
Vessels (Feb 2006)*
52.247-64 All
Preference for Domestic Specialty Metals (Jun 2005)* 252.225-7014
ALTERNATE I
All
Technical Data-Commercial Items (Nov 1995) 252.227-7015 If this order includes delivery of technical
data for a commercial item, component, or
process.
Transportation of Supplies by Sea (May 2002) 252.247-7023 If value of this order is $100,000 or more.
Notification of Transportation of Supplies by Sea (Mar 2000) 252.247-7024 If value of this order is $100,000 or more.
Commercial Computer Software- Restricted Rights 1852.227-19 If this order includes delivery of technical
data or software for a NASA contract.
Revisions: Revised version dates for boxes 3, 7, and 8. Revised title of document and version date for box 4.
SPOC 407 – Military Customer First Article Inspection
Verification of First Article by the Military customer (military quality assurance and/or Defense Contract Management Agency) is
required. The Honeywell Quality Assurance Point of Contact will coordinate First Article inspection by the Military customer at
the supplier.
Revisions: No changes.
SPOC 408 – Ground Support Equipment (GSE) Requirements – CANCELLED
Revisions: SPOC cancelled.
SPOC 409 – Traceability Requirements for Repair and Overhaul – CANCELLED
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Supplemental Purchase Order Conditions (SPOC) Manual(48)