• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2010-06-29 13:31来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

AIRCRAFT
DA 40 Series
AMM Equipment/Furnishings
Doc # 6.02.01
Rev. 5 25-60-00 Page 217
20 Sep 2007
6. Replace the RCPI Battery
This paragraph is valid for the ACK E-01 ELT only.
Detail Steps/Work Items Key Items/References
% (1) Remove the RCPI from the airplane. Refer to Paragraph 5.
(2) Remove the 3 screws which attach the top and
bottom halves of the RCPI.
% Refer to Figure 7.
(3) Loosen the 2 switch attaching nuts from the front
of the RCPI.
(4) Carefully remove the top half of the RCPI. You
will see the battery compartment. Remove the
battery.
(5) Examine the battery contacts. Use a stiff brush
and an electrical contact cleaner to carefully
remove ant dirt or corrosion from the contacts.
CAUTION: DO NOT USE ABRASIVE CLEANERS. THE CONTACTS ARE NICKEL
AND GOLD PLATED SPRING STEEL. AN ABRASIVE CLEANER WILL
REMOVE THIS PLATING AND DAMAGE THE CONTACTS.
(6) If the contacts are badly corroded, replace them.
(7) Insert the battery into the battery compartment.
(8) Install the top half of the RCPI onto the bottom
half of the RCPI.
(9) Install the 3 retaining screws.
(10) Tighten the 2 switch retaining nuts.
% (11) Install the RCPI into the airplane. Refer to Paragraph 5.
(12) Record the date when the RCPI battery is next
due replacement on a self adhesive which is
supplied with the ELT.
(13) Attach the self adhesive label to the ELT where it
can easily seen.
% (14) Do a functional test of the ELT. Refer to Paragraph 3.
AIRCRAFT
Equipment/Furnishings
DA 40 Series
AMM
Page 218
20 Sep 2007 25-60-00 Doc # 6.02.01
Rev. 5
% 7. Remove/Install the RCS
% A. Remove the RCS
%
% Detail Steps/Work Items Key Items/References
% (1) Remove the instrument panel cover. Refer to Section 25-10 of the AMM.
% (2) Disconnect the electrical cable from the rear of
% the RCS.
At the in-line connector.
(3) Remove the 4 screws which attach the RCS to
% the instrument panel.
%
% (4) Move the RCS forward and clear of the airplane.
%
% B. Install the RCS
%
% Detail Steps/Work Items Key Items/References
(1) Move the RCS into position in the instrument
% panel.
%
(2) Install the 4 screws which attach the RCS to the
% instrument panel.
%
% (3) Connect the electrical cable to the rear of the
% RCS.
At the in-line connector.
% (4) Install the instrument panel cover. Refer to Section 25-10 of the AMM.
% (5) Do a functional test of the ELT system. Refer to Paragraph 3.
%
AIRCRAFT
DA 40 Series
AMM Equipment/Furnishings
Doc # 6.02.01
Rev. 5 25-60-00 Page 219
20 Sep 2007
% 8. ELT Periodic Inspection
% The ELT installation must be inspected at least once every 12 months to maintain serviceability.
A. ACK E-01
Detail Steps/Work Items Key Items/References
(1) Examine the ELT and the ELT mounting tray,
look specially for:
S Security of the fasteners.
S Security of all mechanical assemblies.
(2) Examine the Co-axial cable from the ELT to the
antenna. Look specially for:
S Cuts or abrasions to the outer sheath of the
co-axial cable.
(3) Disconnect the co-axial cable from the antenna
and the ELT. Examine the connectors at each
end of the co-axial cable, the antenna and the
ELT for corrosion or damage.
Reconnect the co-axial cable.
(4) Examine the modular cable which connects the
ELT to the RCPI. Look specially for:
S Cuts or abrasions to the outer sheath of the
cable.
(5) Disconnect the modular cable from both the ELT
and the RCPI. Examine the electrical connections
at each end of the modular cable for corrosion or
damage.
Reconnect the modular cable.
(6) Read the expiry dates of the system batteries and
replace the batteries if necessary.
% Refer to Paragraph 4.
% (7) Remove the battery case from the ELT. Refer to Paragraph 4.
AIRCRAFT
Equipment/Furnishings
DA 40 Series
AMM
Detail Steps/Work Items Key Items/References
Page 220
20 Sep 2007 25-60-00 Doc # 6.02.01
Rev. 5
(8) Examine the battery compartment. Look specially
for:
S Corrosion of the battery spring clips.
S Battery leakage. If one battery leaks, then you must
replace all batteries.
% (9) Install the battery case to the ELT. Refer to Paragraph 4.
(10) Do a function test of the ELT system. Refer to Paragraph 3.
B. Jolliet JE2-NG
Detail Steps/Work Items Key Items/References
(1) Examine the ELT and the ELT mounting tray,
look specially for:
S Security of the fasteners.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:钻石40系列AMM 1(148)