• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-09-19 15:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

To start the tests, push the EXECUTE prompt, LSK 6L. The next page is the LIBRARY TEST AUTOTEST INITIALIZATION page.
January 2005
22-11

- 190 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL

 


USE NEXT PAGE AND PREV PAGE KEYS TO SEE THE COMPLETE LIBRARY

LIBRARY TEST
SHOWS TEST
NAME AND NUMBER
WILL RUN

 


USE NEXT PAGE AND PREV PAGE KEYS TO SEE THE COMPLETE LIBRARY THE TESTS FOLLOW THE SAME SEQUENCE AS THE CURRENT STATUS AUTOTESTS AND AUTOPILOT INTERACTIVE AND SURFACE TESTS.


A22-11-00-128.fm
DFCS BITE PAGES - RUN/SKIP SELECT LIBRARY TESTS
January 2005
22-11

- 191 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved

A22-11-00-134.fm
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL

DFCS BITE PAGES - RIGGING
General
The BITE rigging lets you make sure that the control surface actuators and sensors are aligned correctly. The rigging procedure follows the procedure in the part 2 of the maintenance manual. It lets you get position sensor data without extra test equipment. In order to do the rigging tests, FCC A and B must be installed.
To do the rigging test, push LSK 2L on the EXTENDED MAINTENANCE page. This shows the RIGGING INDEX page.
RIGGING INDEX Page
Rigging covers sensors and actuators for these functions as well as setting set command outputs:
-Elevator
-Aileron
-Flaps
-Stabilizer
-CWS
-Mach trim.


To select one of the rigging tests, push the LSK next to the function name. This shows the RIGGING TEST WARNING page.
If you do not want to do any more rigging tests, push LSK 6L to continue to the END OF BITE RIGGING page.
END OF BITE RIGGING Page
This page tells you to turn off the hydraulic power and to push LSK 6L to leave BITE or return to the DFCS BITE MAIN MENU.
RIGGING TEST WARNING Page
This page warns the operator that hydraulic power is on and the control surfaces and the control columns may move. If you want to continue, push LSK 6L to go to the RIGGING SURFACE TEST INITIALIZATION page.
RIGGING SURFACE TEST INITIALIZATION Page
This page gives you some instructions. After you follow the instructions, push LSK 6L to continue. This starts the first surface test from the test library for the rigging test group.
Some of the rigging tests are complex and take many steps to complete.
January 2005
22-11

- 192 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL


OR MACH TRIM RIGGING
A22-11-00-134.fm
DFCS BITE PAGES - RIGGING

January 2005
22-11
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved

A22-11-00-135.fm
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL

DFCS BITE PAGES - RIGGING - STABILIZER 1
General
This shows an example of one of the rigging tests, the stabilizer rigging. You can follow the test through each of the stabilizer rigging pages. You can always go back to the RIGGING INDEX page if you push LSK 6R when it says PREV MENU.
January 2005
22-11

- 194 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL


A22-11-00-135.fm
DFCS BITE PAGES - RIGGING - STABILIZER 1

January 2005
22-11
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved

A22-11-00-136.fm
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL

DFCS BITE PAGES - RIGGING - STABILIZER 2 Stabilizer Rigging Continue This shows more pages of the stabilizer rigging test.
January 2005
22-11
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-700 AVIONCS BITE HANDBOOK 航电自测设备手册 2(5)