• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2011-08-20 12:26来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

4.1.7  Promulgate  4.1.7.1  Provide submission design  I-4-1, 1.5.1, 1.5.2, 1.7 
VOR or  package including a graphical  I-4-9, 
NDB FAF  depiction to the State aviation  I-4-5, 5.5 
Procedure  authority for promulgation via the  I-4-6, 6.5.1, 6.5.2 
Aeronautical Information  II-2-4, 4.4-4.6 
Regulation and Control (AIRAC)  Annex 4, 
document.  11.1-11.10.9 
Annex 4, 
APP 6 
Annex 4, 2.1-2.1.6, 
2.17.3, 2.2-2.18 
4.1.7.2  Distribute to stakeholders.  Annex 15, 6.1 to 6.3 and APP 4 

4.1.8  Maintain VOR or NDB FAF Procedure  4.1.8.1  On a continuous basis (as determined and notified by AIS) ensure that significant changes to obstacles, aerodrome, aeronautical and navaid data are assessed. Criteria and depiction changes are assessed only if required.  Annex 15, 3.1.1.2 and 5.1 
4.1.8.2  On a continuous basis ensure that significant changes to provisions that affect procedure design (stakeholder data and tombstone data) are assessed.  Annex 15, 3.1.1.2 and 5.1 

ATTACHMENT B TO CHAPTER 2
PROCEDURE DESIGN PROCESS FLOW DIAGRAM


Note.— For details of each step, see textual description in the following pages.
The Quality Assurance Manual for Flight Procedure Design — Volume 2
PROCEDURE DESIGN PROCESS FLOW TEXTUAL DESCRIPTION 
Step  Description Input Output Parties Involved  References 0: 
1.  INITIATION This starting point is when a ‘pre-design’ request is made for a new flight procedure design (FPD) or a ‘modification’ request to an existing FPD resulting from feedback, continuous maintenance or periodic review (see steps  Nos. 12 - 14). Justification for the FPD must be clearly stated and must be in accordance with the airspace concept and . Request from a stakeholder for a new or a modified procedure. . Review of an existing procedure. . Navigation strategy considerations. . Managerial decision to set up the procedure design process or to discontinue the activity. . Stakeholders. .  ISO 9001:200section 7.2.1 "Determination of requirements related to the product", section 7.2.2 "Review of 
the State navigation strategy. This is a managerial responsibility to make a decision at this point to ‘go’ or ‘no go’.... . Resource planning. . Feedback on existing procedure.  requirements related to the product", 

section 7.3.1 "Design and development planning" and section 7.3.2 "Design and development inputs"
The Quality Assurance Manual for Flight Procedure Design — Volume 2
PROCEDURE DESIGN PROCESS FLOW TEXTUAL DESCRIPTION
Step
2.
Description
COLLECT AND VALIDATE ALL DATA


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:飞行程序设计质量保证手册(43)