• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2011-08-20 12:26来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

5.8.2  Apply criteria for RNP holding procedure  Doc. 8168, vol. II, Part III, Section 7, Chapter 1 
5.8.3  Document and store RNP holding procedure  Doc. 8168, vol. II, Part III, Section 7, Chapter 1  Annex 15, Ch-3 
5.8.4  Ground verify and validate RNP holding procedure  Doc. 8168, vol. II, Part III, Section 7, Chapter 1  Annex 15, Ch-3 
5.8.5  Flight verify and validate RNP holding procedure  Doc. 8168, vol. II, Part III, Section 7, Chapter 1  Annex 15, Ch-3 
5.8.6  Promulgate RNP holding procedure  Doc. 8168, vol. II, Part I, Section 4, Chapter 1  Annex 4 Ch-2, Ch-7/10/11, App-6 
Part II, Section 4, Chapter 1  Annex 15 Ch-6, App-4 
5.8.7  Maintain RNP holding procedure  Doc. 8168, vol. II, Part III, Section 7, Chapter 1  Annex 15, Ch-3, Ch-5 

43  The Quality Assurance Manual for Flight Procedure Design — Volume 2 
X  Competency Unit 
X.X  Competency Element 
X.X.X  Performance Criteria 

6  Review Instrument Flight Procedures (periodic checks, stakeholder request) 
6.1  Review procedure on a periodical basis 
6.1.1  (Re)-Collect and validate and integrate electronic/paper data for the maintenance of the procedure  (Appropriate Chapter for the type of procedure in question)  Annex 15, Ch. 2, App-7, App-8 
6.1.2  Apply latest criteria to procedures  (Appropriate Chapter for the type of procedure in question) 
6.1.3  Document and store maintained procedure  (Appropriate Chapter for the type of procedure in question)  Annex 15, Ch-3 
6.1.4  Ground verify and validate maintained procedure  (Appropriate Chapter for the type of procedure in question)  Annex 15, Ch-3 
6.1.5  Flight verify and validate maintained procedure  (Appropriate Chapter for the type of procedure in question)  Annex 15, Ch-3 
6.1.6  Promulgate maintained procedure (if necessary)  (Appropriate Chapter for the type of procedure in question)  Annex 4 Ch-2, Ch-7/9/10/11, App-6 
Annex 15 Ch-6, App-4 
6.2  Review procedure based on a stakeholder's request 
6.2.1  Collect, validate and incorporate latest electronic/paper data for the maintenance of the procedure  (Appropriate Chapter for the type of procedure in question)  Annex 15, Ch. 2, App-7, App-8 
6.2.2  Apply latest criteria to procedures  (Appropriate Chapter for the type of procedure in question) 
6.2.3  Assure integration into ATM System (procedural separation, capacity)  (Appropriate Chapter for the type of procedure in question) 
6.2.4  Document and store maintained procedure  (Appropriate Chapter for the type of procedure in question)  Annex 15, Ch-3 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:飞行程序设计质量保证手册(36)