• 热门标签

当前位置: 主页 > 航空资料 > 航空公司 >

时间:2011-04-22 09:35来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

c)  Where possible, the rejected takeoff area should be paved or compacted surface that will sustain the weight of the helicopter in the event of a run on landing.

 

11.10 Airports & airstrips
11.10.1 Airstrips/remote runways
Remote runways/airstrips will be long enough to allow the aircraft to reach take-off decision speed (V1), abort, and remain on the runway.
Length, allowable slope of the airstrip, and other design criteria will be determined using aircraft performance data published by the aircraft manufacturer. If no performance data exists for the air-craft given the temperature and altitude of the airstrip, then a different aircraft model with suitable performance criteria should be selected.
Other dimensional and obstacle clearance dimensions should be determined using ICAO Annex 14, if no other local guidance exists.
Intentionally Blank

 


Section 12 Contents

12 Emergency response planning 87
12.1 Introduction .............................................................................................................................................................87

12.2 Aircraft in the emergency response role..............................................................................................................87

12.2.1 Operator responsibilities.......................................................................................................................................... 87

12.2.2 OGP Member responsibilities ................................................................................................................................ 87

12.2.3 Planning considerations ........................................................................................................................................... 87

12.3 Scenario-based drills...............................................................................................................................................87

12.3.1 General......................................................................................................................................................................... 87

12.3.2 Planning & conducting emergency response drills.............................................................................................88

12.4 Search & Rescue (SAR) services & equipment.................................................................................................88

12.4.1 General..........................................................................................................................................................................88

12.4.2 SAR supportive equipment ......................................................................................................................................88

12.5 Survival equipment ................................................................................................................................................ 90

12.5.1 Survival kits.................................................................................................................................................................90

12.5.2 Life rafts.......................................................................................................................................................................90

12.5.3 Life jackets...................................................................................................................................................................90

12.5.4 Exposure suits for offshore helicopter & float plane flights..............................................................................91

12.5.5 Linked raft rescue system......................................................................................................................................... 92


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:飞机管理指南 Aircraft management guidelines(55)