Figure 7 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 51-31-00
 ALL  ú
 ú  01  Page 16
 ú  Apr 10/89 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

PRIMARY INTEGRAL FUEL TANK SEAL PLANE.
ABSOLUTE FUEL SEAL PER CHAPTER 28 REQUIRED ON:

1A. LOWER PANEL, INTERIOR SURFACE, BETWEEN FRONT SPAR AND REAR SPAR.
1B. UPPER PANEL, INTERIOR SURFACE, BETWEEN FRONT SPAR AND REAR SPAR.
1C. ENTIRE AFT SURFACE OF FRONT SPAR.
1D. ENTIRE FWD SURFACE OF REAR SPAR.
1E. EXTERNAL SEAL PLANES OF FUEL VENTS.

SECONDARY FUEL SEAL PLANE.
ABSOLUTE FUEL SEAL PER BAC5000 REQUIRED ON:

2A. LOWER PANEL, EXTERIOR SURFACE, BETWEEN FRONT SPAR AND REAR SPAR (SEE NOTE).
2B. UPPER PANEL, EXTERIOR SURFACE, BETWEEN FRONT SPAR AND REAR SPAR (SEE NOTE).

____FOR AREAS 2A & 2B SEALANT SHALL BE OMITTED FROM THE MANUFACTURED HEAD OF ALUMINUM RIVETS
NOTE:
UNLESS SPECIFICALLY CALLED OUT ON THE RESPECTIVE SEAL APPLICATION DRAWING.

2C. ENTIRE FWD SURFACE OF FRONT SPAR.
NO. SEC APL DRAWING NO.  DESCRIPTION 
11  65B07736  SEAL APPLICATION - FRONT SPAR 
11  110U3108  SEAL APPLICATION - REAR SPAR 
11  65B07732  SEAL APPLICATION - UPPER PANEL 
11  65B07733  SEAL APPLICATION - LOWER PANEL 

Seal Index and Requirements Wing Center Section
Figure 7 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 51-31-00
 ALL  ú ú 01 Page 17 ú Apr 10/89
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 GENERAL REQUIREMENTS
____________________
 ALL NUTPLATES AND THREADED OR SWAGED COLLAR FASTENERS THAT PENETRATE AN ABSOLUTE
 SEAL AREA MUST BE SEALED.
 DOME TYPE NUTPLATES, WITH OR WITHOUT INTEGRAL O-RING, MUST BE FILLET SEALED.
 THREADED OR SWAGED COLLAR FASTENERS, WITH A MECHANICAL SEAL DEVICE LOCATED ON THE

 SEAL PLANE, DO NOT REQUIRE FILLET OR CAP SEALING UNLESS SPECIFICALLY CALLED OUT

 ON SEAL APPLICATION DRAWING.
 ALUMINUM RIVETS INSTALLED WITH A SELF-SEALING END ON SEAL PLANE DO NOT REQUIRE
 ADDITIONAL SEALING UNLESS SPECIFICALLY CALLED OUT ON SEAL APPLICATION DRAWING.

 ON PRIMARY INTEGRAL TANK SEAL PLANE AREAS:

 SEALANT SHOULD NOT BE APPLIED OVER CORROSION PROTECTIVE COATING UNLESS
 SPECIFICALLY CALLED OUT ON SEAL APPLICATION DRAWING.
 SEALANT MAY BE APPLIED OVER UNPRIMED AREAS.

 ON AREAS OTHER THAN THE PRIMARY INTEGRAL TANK SEAL PLANE: SEALANT MAY BE APPLIED

 OVER BARE AREAS OR CORROSION PROTECTIVE COATING.
 FUNCTIONAL LEAK TEST PER D6-13200 (AFTER SECTION 11 AND SECTION 12 ASSY AND PRIOR
 TO APPLICATION OF SECONDARY FUEL SEAL PLANE SEALANT).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 51-31-00
 ALL  ú ú 01 Page 18 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 DEFINITIONS
___________
 LEVELS OF SEALING.
 ABSOLUTE SEAL - REQUIRES SEALING ALL SEAMS AND OPENINGS OF ANY SHAPE COMMON TO THE SEAL PLANE AND ALL FASTENERS THAT PENETRATE THE SEAL PLANE.
 EXTENSIVE SEAL - SAME AS "ABSOLUTE SEAL" EXCEPT FASTENERS INSTALLED IN CLASS I OR CLOSER TOLERANCE HOLES DO NOT REQUIRE SEALING.
 TYPES OF APPLIED SEALS (FILLET, PREPACK, FAYING SURFACE AND INJECTION SEALS).
 PRIMARY SEAL - THE SEALANT WHICH PRIMARILY PREVENTS LEAKAGE AND IS IN DIRECT CONTACT WITH FUEL AND PRESSURE.
 NOTE: IN SPECIFIC AREAS, SUCH AS SPAR SHEAR TIES, TWO PRIMARY SEALS ARE
____ REQUIRED FOR REALIBILITY (I.E., FILLET SEAL OVER FAYING SURFACE SEAL).
 SECONDARY SEAL - ALL OTHER APPLIED SEALANT.
 THE SEALANT MATERIAL INSTALLED IN CAVITIES TO BACK UP OR SUPPORT THE PRIMARY FILLET SEAL PLACED OVER IT.
 