(3)
It is not easy to apply a primer and paint on the BMS 3-23. The BMS 3-23 gets in the surface and can bleed-out. This can cause the primer and paint to have a unsatisfactory bond.
(4)
Let the primer and enamel dry for a minimum of 8 hours before you apply the BMS 3-23.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
51-24-13
ALL ú ú 03 Page 703 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
(5)
Apply masking tape and paper or plastic to the area where you will not apply the BMS 3-23.
(6)
Apply tape and plastic to the electrical connectors to prevent contamination on the electrical contacts.
(7)
Do not apply BMS 3-23 to the actuator rods.
NOTE: BMS 3-23 or all other hydrocarbons can cause
____ damage to the seals that are used with BMS 3-11 hydraulic fluid.
(8) Be careful when you apply the BMS 3-23 near to silicone rubber seals or clamps with rubber lining.
WARNING: DO NOT LET CORROSION PREVENTIVE COMPOUND GET IN THE OXYGEN
_______ SYSTEM. IF THE CORROSION PREVENTIVE COMPOUND GETS IN THE OXYGEN SYSTEM, A FIRE OR AN EXPLOSION CAN OCCUR.
(9) Make sure you keep the BMS 3-23 corrosion preventive compound out of the oxygen system (AMM 35-00-00/201).
NOTE:____Masking tape is not sufficient. Use plastic or equivalent covers to fully seal the equipment.
B. Consumable Materials
(1)
G00009 Compound - Corrosion Preventive, BMS 3-23, Type I or Type II
(2)
C00755 Compound - Corrosion Preventive, BMS 3-26, Type I
(3)
C00915 Compound - Corrosion Preventive Advanced, BMS 3-29
(4)
G00034 Cheesecloth - Clean and Lint-Free
(5)
G00268 Paint Brush - Nylon or Bristle
C. References
(1) AMM 51-41-03/401, Fuselage Drain Valve - Removal/Installation
D. Procedure
S 027-018
(1)
Remove the drain valves (AMM 51-41-03/401).
(2)
Apply the necessary masking tape and plastic.
S 497-019
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
51-24-13
ALL ú ú 01 Page 704 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 627-011
(3) Apply a layer of the corrosion preventive compound. You can spray it, use a brush or a cloth to apply it.
NOTE: Make sure a sufficient quantity of air can flow through the
____ closed areas like the cavities and cargo compartments.
S 627-012
(4)
Permit the layer to stay on the surface for a minimum of 30 minutes to make sure it gets into the mating surfaces.
S 147-013
(5)
Remove the unwanted corrosion preventive compound from the surface with clean wipers.
NOTE:____Only a thin layer is necessary. A thick layer will not give better protection than a thin layer, and will hold dirt.
S 957-014
(6)
Remove all the masking tape, and the protective paper or plastic.
S 847-015
(7)
Make sure a sufficient quantity of air can flow through the closed areas like the cavities and cargo compartments until they are dry.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 结构 STRUCTURES(59)