• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2010-11-03 14:57来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

The purpose of the temporary flight plan is to allow the flight crew to review the revision on the
MCDU and on the ND before inserting it into the active flight plan.
It is a copy of the active flight plan that has been changed according to the flight crew revision.
While it is displayed, the aircraft will continue to follow the original active flight plan. As long as
there is a temporary flight plan, the flight crew cannot make revisions on the secondary flight plan.
No predictions are computed or displayed on the pages of the temporary flight plan.
A temporary flight plan is displayed for a check and/or new modification. Inserting the temporary
revision will modify the active flight plan.
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 18/24
FCOM 19 AUG 10
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 19/24
FCOM 19 AUG 10
LATERAL REVISIONS
Applicable to:
The flight crew can revise the lateral flight plan following two types of revisions:
1. Lateral revisions that have an immediate effect on the active flight plan:
The flight crew inserts ‐ a new waypoint directly on the F-PLN page, deletes, or changes a
waypoint from it:
When the flight crew enters a new waypoint, which does not exist in the flight plan, the following
waypoint moves down the flight plan, with a discontinuity shown after the new waypoint.
‐ The flight crew adds a direct leg (DIR TO) from his present position to a selected waypoint:
The flight crew can change the “TO” waypoint of the active leg. The DIR TO function gives
access to DIR TO, DIR TO ABEAM, or DIR TO/INTERCEPT. The active leg then goes from the
present position (T/P) to the waypoint selected or inserted as the new “TO” waypoint.
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 20/24
FCOM 19 AUG 10
2. Lateral revisions that lead to a temporary flight plan (TMPY) before they take effect:
The flight crew creates a temporary flight plan, then inserts it as a revision to the active flight plan.
The flight crew does this when selecting, deleting, or modifying several waypoints of an airway or
procedure at once (SID, STAR, HOLD, TAKEOFF or LANDING RWY). This modification is made
on specific “LAT REV” pages from the flight plan page.
Possible revisions are:
‐ Insert or modify the departure procedure
‐ Insert or modify the arrival procedure
‐ Insert a waypoint
‐ Change the destination
‐ Insert an airway
‐ Insert an offset
‐ Insert a holding pattern
‐ Select or enable an alternate flight plan
‐ Fix information.
The purpose of the temporary flight plan is to allow the flight crew to check a revision on the
MCDU and on the ND before inserting the changes into the active flight plan. It is a copy of the
active flight plan that has been changed according to the flight crew revision. While it is displayed,
the aircraft will continue to follow the original active flight plan.
No predictions are computed or displayed on the pages of the temporary flight plan.
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 21/24
FCOM 19 AUG 10
A temporary flight plan is displayed for a check and/or new modification. Inserting the temporary
revision will modify the active flight plan.
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 22/24
FCOM 19 AUG 10
LATERAL REVISIONS
Applicable to:
,
,
MSN,,
4538,,
The flight crew can revise the lateral flight plan in three ways. All lateral revisions of the F-PLN lead
the FMS to create a temporary flight plan (TMPY) before they take effect:
‐ The flight crew inserts a new waypoint directly on the F-PLN page, deletes, or changes a waypoint
from it:
• After inserting a waypoint, a F-PLN discontinuity is inserted between the inserted waypoint and
the following one.
• After deleting a waypoint, a F-PLN discontinuity is inserted between the preceding waypoint and
the following one.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320机组操作手册FLIGHT CREW OPERATING MANUAL 1(74)