• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2010-11-03 14:57来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

The flight crew can only create direct legs between manually defined geographic points (navaids,
airports, waypoints).
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 10/24
FCOM 19 AUG 10
Note: The departure and arrival procedures are defined in the database to minimize the amount
of memory required.
They are divided, as follows:
‐ DEPARTURE = SID + EN ROUTE TRANSITION
‐ ARRIVAL = APPR VIA + STAR + EN ROUTE TRANSITION
The SID is the central common part of the departure procedure, as the STAR is of the
arrival procedure. Enroute transitions (TRANS) are the various possible trajectories defined
between the last SID point and the first enroute waypoints, and between the last enroute
waypoint and the first fix of the STAR . ”APPR VIAs” are the possible trajectories, defined
between the last STAR point and the first point of the approach.
MANUAL LEGS
Applicable to: ALL
A MANUAL leg stays on a constant TRK or HDG and has no termination point. The flight crew
cannot insert it into a flight plan manually: it is part of a given procedure such as a SID or a STAR.
When the aircraft is flying a MANUAL leg, the NAV mode remains engaged and predictions assume
that the aircraft will fly a direct leg from its present position to the next waypoint (DIR TO). When the
aircraft is cleared to fly to the next waypoint of the flight plan, the flight crew performs a DIR TO.
Note: 1. In NAV mode, a MANUAL leg is sequenced only by performing a DIR TO.
2. The use of the descent mode (DES) on a MANUAL leg is not recommended.
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 11/24
FCOM 19 AUG 10
FLIGHT PLAN CONSTRUCTION
Applicable to:
There are three ways of defining the route:
1. A company route, that is in the database, and is known by the flight crew.
The flight crew enters the name of the CO RTE into the [1L] field of the INIT A page. This action
enters all the elements of the flight plan. The database usually includes an alternate route
associated with the destination.
2. A company route, that is in the database, but the flight crew does not know it is there.
The flight crew enters a city pair in the [1R] field. The ROUTE SELECTION page automatically
appears and enables the flight crew to review all stored routes between the two cities before
selecting one of them.
3. There is no company route between the two cities.
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 12/24
FCOM 19 AUG 10
The flight crew enters the city pair in the [1R] field. The ROUTE SELECTION page appears and
displays “NONE”.
The flight crew has to manually construct the entire flight plan.
For procedure, Refer to PRO-NOR-SRP-01-10-A FLIGHT PLAN INITIALIZATION - GENERAL.
FLIGHT PLAN CONSTRUCTION
Applicable to:
There are three ways of defining the route:
1. A company route, that is in the database, and is known by the flight crew.
The flight crew enters the name of the CO RTE into the [1L] field of the INIT A page. This action
enters all the elements of the flight plan. The database usually includes an alternate route
associated with the destination.
2. A company route, that is in the database, but the flight crew does not know it is there.
The flight crew enters a city pair in the [1R] field. The ROUTE SELECTION page automatically
appears and enables the flight crew to review all stored routes between the two cities before
selecting one of them.
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
AIRCRAFT SYSTEMS
AUTO FLIGHT - FLIGHT MANAGEMENT
FLIGHT PLANNING - LATERAL FUNCTIONS
A318/A319/A320/A321 FLEET DSC-22_20-30-10-05 P 13/24
FCOM 19 AUG 10
3. There is no company route between the two cities.
The flight crew enters the city pair in the [1R] field. "NONE” automatically appears in the CO RTE
[1L] field, without automatically displaying the ROUTE SELECTION page.
The flight crew has to manually construct the entire flight plan.
For procedure, Refer to PRO-NOR-SRP-01-10-A FLIGHT PLAN INITIALIZATION - GENERAL.
FLIGHT PLAN CONSTRUCTION
Applicable to:
,
,
MSN,,,,
There are three ways of defining the route:
1. A company route, that is in the database, and is known by the flight crew.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320机组操作手册FLIGHT CREW OPERATING MANUAL 1(72)